Search for planning and housing data
236 results
Dataset:
-
Typology type: Category
14JInstallation or alteration etc of solar equipment on non-domestic premises
The installation, alteration or replacement of: (a) microgeneration solar thermal equipment on a building; (b) microgeneration solar PV equipment on a building; or (c) other solar PV equipment on the roof of a building
- Dataset
- Permitted development right
- Reference
- 14J
-
Typology type: Category
14KInstallation or alteration etc of stand-alone solar equipment on non-domestic premises
The installation, alteration or replacement of stand-alone solar for microgeneration within the curtilage of a building other than a dwellinghouse or a block of flats
- Dataset
- Permitted development right
- Reference
- 14K
-
Typology type: Category
14LInstallation or alteration etc of ground source heat pump on non-domestic premises
The installation, alteration or replacement of a microgeneration ground source heat pump within the curtilage of a building other than a dwellinghouse or a block of flats
- Dataset
- Permitted development right
- Reference
- 14L
-
Typology type: Category
14MInstallation or alteration etc of water source heat pump on non-domestic premises
The installation, alteration or replacement of a microgeneration water source heat pump within the curtilage of a building other than a dwellinghouse or a block of flat
- Dataset
- Permitted development right
- Reference
- 14M
-
Typology type: Category
14NInstallation etc of flue for biomass heating system on non-domestic premises
The installation, alteration or replacement of a flue, forming part of a microgeneration biomass heating system, on a building other than: (a) a dwellinghouse or a block of flats; or (b) a building situated within the curtilage of a dwellinghouse or a block of flats.
- Dataset
- Permitted development right
- Reference
- 14N
-
Typology type: Category
14OInstallation etc of flue for combined heat and power on non-domestic premises
The installation, alteration or replacement of a flue, forming part of a microgeneration combined heat and power system, on a building other than: (a) a dwellinghouse or a block of flats; or (b) a building situated within the curtilage of a dwellinghouse or a block of flats
- Dataset
- Permitted development right
- Reference
- 14O
-
Typology type: Category
15AGas transporters
Development by a gas transporter required for the purposes of its undertaking consisting of: (a) the laying underground of mains, (b) the installation in a gas distribution system of apparatus for measuring, controlling or varying the pressure, flow or volume of gas, and structures for housing such apparatus; (c) the construction in any storage area or protective area specified in an order made under section 4 of the Gas Act 1965 (storage authorisation orders)(65), and the erection or construction in any such area of any plant or machinery required in connection with the construction of such boreholes; (d) the placing and storage on land of pipes and other apparatus to be included in a main or pipe which is being or is about to be laid or constructed in pursuance of planning permission granted or deemed to be granted under Part 3 of the Act (control over development); (e) the erection on operational land of the gas transporter of a building solely for the protection of plant or machinery; (f) any other development carried out in, over or under the operational land of the gas transporter.
- Dataset
- Permitted development right
- Reference
- 15A
-
Typology type: Category
15BElectricity undertakings
Development by statutory undertakers for the generation, transmission, distribution or supply of electricity for the purposes of their undertaking consisting of: (a) the installation or replacement in, over or under land of an electric line and the construction of shafts and tunnels and the installation or replacement of feeder or service pillars or transforming or switching stations or chambers reasonably necessary in connection with an electric line; (b) the installation or replacement of any electronic communications line which connects any part of an electric line to any electrical plant or building, (c) the sinking of boreholes to ascertain the nature of the subsoil and the installation of any plant or machinery reasonably necessary in connection with such boreholes; (d) the extension or alteration of buildings on operational land; (e) the erection on operational land of the undertaking or a building solely for the protection of plant or machinery; (f) any other development carried out in, over or under the operational land of the undertaking
- Dataset
- Permitted development right
- Reference
- 15B
-
Typology type: Category
16AElectronic communications code operators
Development by or on behalf of an electronic communications code operator for the purpose of the operator’s electronic communications network in, on, over or under land controlled by that operator or in accordance with the electronic communications code, consisting of: (a) the installation, (b) the use of land in an emergency for a period not exceeding 6 months to station and operate moveable electronic communications apparatus required for the replacement of unserviceable electronic communications apparatus, or (c) development ancillary to radio equipment housing.
- Dataset
- Permitted development right
- Reference
- 16A
-
Typology type: Category
16BOther telecommunications development
The installation, alteration or replacement on any building or other structure of a height of 15 metres or more of a microwave antenna and any structure intended for the support of a microwave antenna
- Dataset
- Permitted development right
- Reference
- 16B