Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected

Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?

For example, 27 3 2021

Do you want to see entries since the date or after the date?

Clear

8,643 results

  • Yorkshire Water CEMP

    Policy

    No works shall commence above ground prior to the completion of a Construction Environmental Management Plan (CEMP) study to understand the impact of planning permission on the principal aquifer. Furthermore, the findings and recommendations of the approved CEMP must be implemented.

    Reference
    U0112129
  • Amended Plans

    Policy

    The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: Proposed Site Plan 220041-WDK-030SI-DR-A-04003 REV P05 - amended 15/03/2023 Typical Site Layout - 220041 WDK 03 SI DR A 04006 REV P03 - Amended 15/03/2023 Proposed Plans (double unit) 220041-WDK-ZZ-ZZ-DR-A-04004 REV P04 - received 11/01/2023 Proposed Plans (single unit) 220041-WDK-ZZ-ZZ-DR-A-04005 REV P04 - received 11/01/2023

    Reference
    U0112150
  • EA FRA

    Policy

    The development shall be carried out in accordance with the submitted Addendum to the FRA (prepared by Waldeck Consulting, reference 220041-WDK-00-SI-RP-C-33301, Version P02, dated 1 June 2023) and the following mitigation measures it details: - Finished floor levels shall be set no lower than 3.6 metres above Ordnance Datum (AOD) The mitigation measure shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measure detailed above shall be retained and maintained thereafter throughout the lifetime of the development.

    Reference
    U0112151
  • CTMP

    Policy

    Development shall not commence until Construction Traffic Management Plan (CTMP) for that phase of development is submitted to and subsequently approved in writing by the Local Highway Authority. The approved plan shall be adhered to throughout the construction phase. I would expect the CTMP to contain information relating to (but not limited to): o Volumes and types of construction vehicles o identification of delivery routes; o identification of agreed access point o Contractors method for controlling construction traffic and adherence to routes o Size, route and numbers of abnormal loads o Swept path analysis (as required) o Construction Period o Temporary signage o Measures to control mud and dust being transferred to the public highway o Timing of deliveries

    Reference
    U0112152
  • Flood Evacuation Plan

    Policy

    Prior to above ground works a Flood Evacuation Plan should be submitted to the Local Planning Authority for approval, once agreed the development shall be carried out in accordance with the plan and each caravan shall have a copy of the plan within it. The Flood Evacuation Plan shall be implemented for the lifetime of the development.

    Reference
    U0112153
  • Construction Hours

    Policy

    Demolition or construction works shall not take place outside 7am to 5pm Mondays to Fridays and 9am to 1pm on Saturdays or at any time on Sundays or Bank Holidays.

    Reference
    U0112154
  • Approved Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans and specifications. Site / location plan. Project number: PQ3329. Drawing number: 03. Date received: 22/06/2023. Existing and proposed plans (Proposals). Project number: PQ3329. Drawing number: 01. Date received: 22/06/2023.

    Reference
    U0112166
  • In accordance with plans specified

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Proposed Plans (Including Site & Location Plan): Drawing No. 001 as received 17/05/2023

    Reference
    U0112167
  • Approved Plans

    Policy

    The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: Proposed floor plans and elevations including site plan and location plan. Drawing number: 3664-02J. Date recieved: 20/07/2023.

    Reference
    U0112172
  • External Materials

    Policy

    The external materials to be used in the construction of the extensions hereby approved shall utilise reclaimed limestone and tiles from the demolished areas of the building. Any new limestone, brick, or tile to be used in the development shall match the existing materials.

    Reference
    U0112173