Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected

Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?

For example, 27 3 2021

Do you want to see entries since the date or after the date?

Clear

8,643 results

  • Permitted Development Restriction

    Policy

    Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (No.596) (England) Order 2015, Article 3, Schedule 2: Part 1 (or any subsequent order or statutory provision revoking or re-enacting that order) no additions, extensions or other alterations other than that expressly authorised by this permission shall be carried out without prior permission of the Local Planning Authority. This includes the insertion of additional windows.

    Reference
    U0112333
  • Permitted Development Restriction

    Policy

    Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (No.596) (England) Order 2015, Article 3, Schedule 2: Part 2 (or any subsequent order or statutory provision revoking or re-enacting that order) no additional walls, fences or other means of enclosure (other than those shown on approved plan 01 R8) shall be erected on land between the walls of any dwellings fronting a highway and the highway boundary without the prior permission of the Local Planning Authority.

    Reference
    U0112334
  • Drainage DA01

    Policy

    The development hereby granted shall not be begun until details of the foul, surface water and land drainage systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the drainage system shall be operating to the prior to the occupation of the development.

    Reference
    U0112335
  • Contamination CON2

    Policy

    Should any unexpected significant contamination be encountered during development, all associated works shall cease and the Local Planning Authority (LPA) be notified in writing immediately. A Phase 3 remediation and Phase 4 verification report shall be submitted to the LPA for approval. The associated works shall not re-commence until the reports have been approved by the LPA.

    Reference
    U0112336
  • Construction Hours

    Policy

    Demolition or construction works shall not take place outside the following hours: 08:00 to 1800 hours Mondays to Fridays 8:00 to 13:00 on Saturdays Demolition or construction works shall not take place at any time on Sundays or Bank Holidays.

    Reference
    U0112337
  • Floor Levels

    Policy

    No development shall take place until full details have been submitted to and agreed in writing by the local planning authority of the existing and proposed ground levels within the site and its boundaries and the proposed finished floor levels of the dwelling. The development shall be carried out in accordance with the approved details and retained as such thereafter.

    Reference
    U0112338
  • Soft Landscaping

    Policy

    No development shall take place on the site until a detailed soft landscape scheme has been submitted to and approved in writing by the Local Planning Authority. The soft landscape scheme shall include a soft landscape plan; a schedule providing plant and tree numbers and details of the species, nursery stock specification; a specification of planting and staking/guying; a timescale of implementation; and details of aftercare for a minimum of 5 years following practical completion of the landscape works. Thereafter the landscape scheme shall be implemented in full accordance with the approved details and the Local Planning Authority notified in writing within 7 working days to approve practical completion of any planting within public areas or adoptable highway within the site. Soft landscaping for any individual housing plot must be implemented in full accordance with the approved scheme, prior to occupation of the home, which will be monitored by the Local Planning Authority. Any part of the scheme which fails to achieve independence in the landscape, or is damaged or removed within five years of planting shall be replaced during the next available planting season in full accordance with the approved scheme.

    Reference
    U0112339
  • Approved Plans

    Policy

    The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: Location Plan: Date received: 11/05/2023. Site Plan. Revision 'C'. Date received: 16/07/2023. Existing and proposed plans. Revision 'B'. Date received: 16/07/2023.

    Reference
    U0112344
  • Approved Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans and specifications. Location Plan. Drawing number: 23-039-1. Date received: 27/07/2023. Site Plan. Drawing number: 23-039-2. Revision A. Date received: 21/07/2023. Proposed floor plans. Drawing number: 23-039-4. Revision A. Date received: 21/07/2023. Proposed elevations. Drawing number: 23-039-5. Revision A. Date received: 21/07/2023. Proposed garden room / gym. Drawing number: 23-039-5. Date received: 27/06/2023.

    Reference
    U0112368
  • Materials

    Policy

    As indicated on the approved plans, brickwork shall match existing and any render shall be off-white / cream in colour.

    Reference
    U0112369