Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected

Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?

For example, 27 3 2021

Do you want to see entries since the date or after the date?

Clear

8,643 results

  • Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Dwg. No. 3004 Rev P-01 Floor plan showing location of Proposed Air Conditioning Units Dwg. No. 3005 Rev P-01 Main Elevation and Visual Showing Location of Proposed Air Conditioning Units

    Reference
    U0113191
  • Implementation

    Policy

    The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.

    Reference
    U0113192
  • Approved Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Existing and Proposed Plans (23.07-D1) - Site Location and Block Plan (23.07-D2)

    Reference
    U0113193
  • Opening Hours

    Policy

    The premises shall not be open to the public, nor shall deliveries from the premises be made, before the hours of 0600 or after 2200 Monday to Sunday. The unit shall be used as a café from 0600 until 1700 and from 1700 until 2200 as a takeaway.

    Reference
    U0113194
  • Implementation

    Policy

    The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.

    Reference
    U0113216
  • Approved Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Site Red Line Boundary (5601-POI-DRG-CIV-400003 Rev P01) - Site Modification Layout (5601-POI-DRG-CIV-400004 Rev P01) - Site Arrangement Layout (5601-POI-DRG-CIV-400005 Rev P02) - Proposed Elevations (5601-POI-DRG-CIV-400007 Rev P03) - Typical Equipment Details (5601-POI-DRG-CIV-400008 Rev P01) - Substation Drawing (Substation GA-01 Rev B)

    Reference
    U0113217
  • Lighting Levels

    Policy

    The lighting details shall be carried out in accordance with the following approved documents: - 'Gemma Lighting' specification sheet - Ionity Doncaster Site Lighting Calculations (received 11 September 2023) The average lighting levels across the site shall not exceed 10 lux in accordance with the approved lighting calculations.

    Reference
    U0113218
  • Approved Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Dwg No. 983-CPA-ZZ-ZZ-DR-A-2012 Revised Parking Proposals received 04.09.23 Dwg No. 983-CPA-ZZ-00-DR-A-1201 Rev P01 GIA Area Plan received 05.05.23 Dwg No. 983-CPA-ZZ-ZZ-DR-A-0601 Rev P01 Block 1 GA Elevations received 05.05.23 Dwg No. 983-CPA-ZZ-ZZ-DR-A-0602 Rev P01 Block 2 GA Elevations received 05.05.23 Dwg No. 983-CPA-ZZ-ZZ-DR-A-0603 Rev P01 Block 3 GA Elevations received 05.05.23 Dwg No. 983-CPA-ZZ-ZZ-DR-A-0610 Rev P01 Site Elevations received 05.05.23 Dwg No. 983-CPA-ZZ-01-DR-A-0111 Rev P01 Site Roof Plan received 05.05.23 Dwg No. 983-CPA-ZZ-ZZ-DR-A-0201 Rev P01 Block 1 GA Plans and Sections received 05.05.23 Dwg No. 983-CPA-ZZ-ZZ-DR-A-0202 Rev P01 Block 2 GA Plans and Sections received 05.05.23 Dwg No. 983-CPA-ZZ-ZZ-DR-A-0203 Rev P01 Block 3 GA Plans received 05.05.23 Dwg No. 983-CPA-ZZ-ZZ-DR-A-0204 Rev P01 Block 3 GA Sections received 05.05.23 Dwg No. PWP 748 002 Rev 04 Landscape Plan and Specification received 15.08.23 Dwg No. 16-17442-HLEA-XX-XX-DR-Y-0708002 Rev P3 External Lighting Layout received 15.08.23 Dwg No. 16-17442-HLEA-XX-XX-DR-Y-0708003 Rev P3 External Lighting Isoline Drawing received 15.08.23 Dwg No. SL07626-HBPW-XX-XX-DR-C-0500 Rev P05 Preliminary Drainage Strategy received 15.08.23 Sustainability Stage 2 Report Energy Strategy and Part L2 2021 Compliance Revisions REV 05 - 04 May 2023 received 05.05.23 Plot 3F Gateway East Doncaster Ecological Assessment doc ref 9382.002 Version 3.0 received 25.07.23 Plot 3F Gateway East Doncaster Ecological Mitigation and Enhancement Plan doc ref 9382.005 Version 2.0 received 05.05.23

    Reference
    U0113224
  • High1

    Policy

    Before the development is brought into use, that part of the site to be used by vehicles shall be surfaced, drained and where necessary marked out in accordance with the details set out within the submitted Preliminary Drainage Strategy.

    Reference
    U0113225
  • In acc with approved plans specified

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan 13664-LP-077, received 10/07/2023 - Proposed Substation Elevations 13664-P04-077, received 08/06/2022 - Proposed Jet Wash Details 13664-P05-077, received 08/06/2022 - Forecourt Canopy Detail 13664-P03-007-B, received 11/11/2022 - Proposed Site Layout 13664-P02-007-C, received 10/07/2023 - Proposed LV Enclosure Elevations 13664-P06-077, received 10/07/2023

    Reference
    U0113227