Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected

Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?

For example, 27 3 2021

Do you want to see entries since the date or after the date?

Clear

8,643 results

  • Drainage details (amended)

    Policy

    The Drainage System as approved under reference 23/00523/COND shall be implemented in accordance with approved drawings listed below: - Drainage Plan, 13664-077-33-A - Surface Water Strategy Report (Marks Heeley Ltd, ref. H16601), April 2023 - Finishes Plan, 13664-077-46 Works shall be carried out concurrently with the development and the drainage system shall be operating to the satisfaction of the Local Planning Authority prior to the occupation of the development.

    Reference
    U0113228
  • Surface water via interceptor (amended)

    Policy

    All surface water run off from the site, excepting roof water, shall be discharged to the public surface water sewer/land drainage system or Highway Drain via a suitable oil/petrol/grit interceptor. These arrangements shall be implemented according to details listed below and as approved by the Local Planning Authority under reference 23/00523/COND and they shall be fully operational before the site is brought into use. - Drainage Plan, 13664-077-33-A - Surface Water Strategy Report (Marks Heeley Ltd, ref. H16601), April 2023 - Finishes Plan, 13664-077-46

    Reference
    U0113229
  • Vehicle wash run off (amended)

    Policy

    Any water run off from the vehicle wash down area shall be discharged to the public foul sewer (in accordance with PPG13-Vehicle washing and cleaning) via a suitable oil/ petrol/grit interceptor. These arrangements shall be implemented according to details listed below and as approved by the Local Planning Authority under reference 23/00523/COND and they shall be fully operational before the site is brought into use. - Drainage Plan, 13664-077-33-A - Surface Water Strategy Report (Marks Heeley Ltd, ref. H16601), April 2023 - Finishes Plan, 13664-077-46

    Reference
    U0113230
  • CTMP (amended)

    Policy

    The Construction Traffic Management Plan as approved under reference 23/00392/COND (Bellamy Roberts, DE/MT/5859/CTMP.1 February 2023). The development shall be carried out in accordance with the agreed details.

    Reference
    U0113231
  • Facilitation tree works

    Policy

    Tree surgery work shall be carried out in full accordance with the scheme hereby approved and in compliance with clause 7: Pruning and related work of British Standard 3998: 2010 Tree Work - Recommendations.

    Reference
    U0113232
  • Piped discharge

    Policy

    There shall be no piped discharge of surface water from the development prior to the completion of surface water drainage works , details of which will have been submitted to and approved by the Local Planning Authority. If discharge to public sewer is proposed , the information shall include , but not be exclusive to:- a) evidence to demonstrate that surface water disposal via infiltration or watercourse are not reasonably practical; b) evidence of existing positive drainage to public sewer and the current points of connection; and c) the means of restricting the discharge to public sewer to the existing rate less a minimum 30% reduction, based on the existing peak discharge rate during a 1 in 1 year storm event, to allow for climate change.

    Reference
    U0113233
  • stat

    Policy

    The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.

    Reference
    U0113251
  • plans list

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Proposed plans and sections (CCD:04/2201 Rev A) dated APR 23 received 24.7.23 Proposed elevations and roof plan (CCD:04/2202 Rev A) dated APR 23 receievd 24.7.23

    Reference
    U0113252
  • materials

    Policy

    Prior to the commencement of the relevant works, details of the proposed external materials shall be submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved materials.

    Reference
    U0113253
  • Alterations to the existing fire escape

    Policy

    Prior to relevant works full details of the alterations to the current fire escape from the basement area shall be submitted to and agreed in writing by the Local Planning Authority. Details shall include how the impact on any historic fabric will be minimised, details of the railings to be installed around the building and the new door. Repairs to render shall match existing in finish/texture and all to be coloured to match the adjoining stonework unless otherwise agreed in writing by the Local Planning Authority. Works to be carried out in accordance with agreed details.

    Reference
    U0113254