Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected

Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?

For example, 27 3 2021

Do you want to see entries since the date or after the date?

Clear

8,643 results

  • Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: General Arrangement - BB1536-01-DR-0100-001 Rev P03 'Bridge Plans 1-3 for Planning' Method Statement & Risk Assessment Rev3 15/6/23 Environmental Risk and Mitigation Review Google Map - Hatfield laydown area for Beaver Bridges

    Reference
    U0113339
  • Ecol enhancement

    Policy

    Within 1 month of the development having been completed, an ecological enhancement plan shall be submitted to the local planning authority for approval in writing. This plan shall include details of the following measures, all of which shall be implemented prior to the completion of all works. o Two bat boxes to be permanently attached to the underside of the bridge with the type location and fixing to be determined by a suitably qualified ecologist.

    Reference
    U0113340
  • drainage (amended)

    Policy

    Prior to the permanent bridge coming into use, a scheme detailing how the bridge and associated infrastructure to access the bridge will satisfactorily drain in order to prevent surface water flooding shall be submitted to the Local Planning Authority for written approval. The drainage scheme, as approved by the Local Planning Authority, shall be subsequently installed and maintained for the life of the development.

    Reference
    U0113341
  • EA condition

    Policy

    The development shall be carried out in accordance with the details referenced within the email from Peter Andrew to Roy Sykes (ref: Temporary Bridge, Evergreen, dated 9th August 2023) and the following mitigation measure shall be included: + The soffit level of the bridge shall be set no lower than 2.18 metres above Ordnance Datum, which provides a 1.00 metre freeboard above the design flood height. + The measure detailed above shall be retained and maintained thereafter throughout the lifetime of the development.

    Reference
    U0113342
  • Amended/approved plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the amended/approved plans listed below: Title: Block Plan. Scale: 1:500. Tile: Plan Revision 'B' (Existing and Proposed Floor and Elevation Plans). Scale: 1:50. Received by City of Doncaster Council on the 11/08/2023.

    Reference
    U0113345
  • Implementation

    Policy

    The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.

    Reference
    U0113348
  • Approved Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Dwg. No. JBA.3611.101.C

    Reference
    U0113349
  • External Materials

    Policy

    Prior to the commencement of the above ground works, details of the proposed external materials shall be submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved materials.

    Reference
    U0113350
  • Drainage DA01

    Policy

    The development hereby granted shall not be begun until details of the foul, surface water and land drainage systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the drainage system shall be operating prior to the occupation of the development.

    Reference
    U0113351
  • Soft Landscaping

    Policy

    No development above ground floor level shall take place on the site until details of a landscaping/planting scheme have been agreed in writing with the Local Planning Authority. This scheme shall indicate all existing trees and hedgerows on the site, showing their respective size, species and condition. It shall distinguish between those which are to be retained, those proposed for removal and those requiring surgery. The scheme should also indicate, where appropriate, full details of new or replacement planting. All planting material included in the scheme shall comply with Local Planning Authority's 'Landscape Specifications in Relation to Development Sites'. Planting shall take place in the first suitable planting season, following the commencement of the development. Any tree or shrub planted in accordance with the scheme and becoming damaged, diseased, dying or removed within five years of planting shall be replaced in accordance with the above document.

    Reference
    U0113352