The development shall be carried out in accordance with the submitted flood risk assessment by Alan Wood and Partners referenced JAG/AD/JR/49495-Rp001 and dated 2 August 2023, and the following mitigation measures it details: - Finished floor levels shall be set no lower than 2.66 meters Above Ordnance Datum (mAOD) as set detailed within section 7.2.5 of the FRA. - The shed shall be of an open construction and have an open-door policy to allow flood waters to pass though unheeded as set out in paragraphs 7.3.1 - 7.3.3 of the FRA. - Electrical or other flood sensitive equipment shall be elevated to 4.40 mAOD or above as detailed in paragraph 7.3.5 of the FRA. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.