Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected

Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?

For example, 27 3 2021

Do you want to see entries since the date or after the date?

Clear

8,643 results

  • Drainage details to be agreed

    Policy

    Notwithstanding demolition, the development hereby granted shall not be begun until details of the foul and surface water systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the drainage system shall be operating to the satisfaction of the Local Planning Authority prior to the occupation of the development.

    Reference
    U0114309
  • Ecological Enhancement Plan

    Policy

    Within 2 months of the commencement of development a biodiversity enhancement plan shall be submitted to and approved in writing by the Local Planning Authority. The plan shall be based on the measures set out in the Preliminary Ecological Appraisal (Weddle Landscapes June 2022) and show, in detail, the specifications and locations of features and provisions across the site.

    Reference
    U0114310
  • Landscaping

    Policy

    Within 3 months of development commencing, a detailed soft landscape scheme has been submitted to and approved in writing by the Local Planning Authority. The scheme shall include a soft landscape plan, a schedule providing plant and tree numbers and details of the species, nursery stock specification in accordance with British Standard 3936: 1992 Nursery Stock Part One and planting distances of trees and shrubs; a specification of planting and staking/guying; a timescale of implementation and details of aftercare for a minimum of 5 years following practical completion of the landscape works. Thereafter the landscape scheme shall be implemented in full accordance with the approved details and the Local Planning Authority notified in writing within 7 working days to approve practical completion of the planting. Any part of the scheme which fails to achieve independence in the landscape, or is damaged or removed within five years of planting shall be replaced during the next available planting season in full accordance with the approved scheme, unless the local planning authority gives its written approval to any variation.

    Reference
    U0114311
  • Materials

    Policy

    Prior to the implementation of the relevant site works samples or details of the brick, stone, and roofing material to be used in the construction of the buildings and its boundary walls shall be submitted to and approved in writing by the local planning authority.

    Reference
    U0114312
  • Windows and doors

    Policy

    Before the commencement of the relevant site works, details of the design, materials, and finish of all windows and external doors to be used in the construction of the buildings hereby approved shall be submitted to and approved in writing by the local planning authority. Unless otherwise agreed in writing, the details shall include an elevation at 1:20 scale of each door or window type and 1:5 scale cross-sections. Development shall be carried out in accordance with the approved details.

    Reference
    U0114313
  • CEMP

    Policy

    On commencement of development activities, a Construction Environmental Management Plan (CEMP) shall be implemented. The Construction Environmental Management Plan will be based on the measures outlined in the PEA (Weddle Landscapes June 2022) table 8 pg. 28, as well as requiring the following measures to be carried out: -The use of protective fencing, exclusion barriers and other measures to prevent deep excavations trapping terrestrial fauna. -If protective species are encountered during construction activities all work must stop and a qualified and experienced ecologist must be called to deal with the implications. -All lighting employed during construction activities should be located so as to avoid light spill into surrounding vegetation.

    Reference
    U0114314
  • Tree protection

    Policy

    The scheme of protection for all retained trees, including tree management, ground protection measures and the erection of impact resistant protective barriers shall be implemented in full accordance with the requirements contained within the approved Weddle Landscape Design Tree Protection Plan (ref. drawing number 1424 - 003 rev. A dated May 22) before any equipment, machinery or materials have been brought on to site for the purposes of the development. The local planning authority shall be notified of implementation and shall visit site to approve the setting out of the site and location of protective barriers prior to the commencement of development. Thereafter tree protection practices shall be implemented and monitored in full accordance with the approved scheme until all equipment, machinery and surplus materials have been removed from the site, unless the local planning authority gives its written approval to any variation. Nothing shall be stored or placed in any area fenced in accordance with this condition and the ground levels within those areas shall not be altered, nor shall any excavation be made, without the written consent of the local planning authority.

    Reference
    U0114315
  • Residential annex

    Policy

    The residential annex hereby permitted shall not be occupied at any time other than for purposes ancillary to the residential use of the main dwelling.

    Reference
    U0114316
  • In accordance with specified plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan, drawing no. 22018-1005-A - Proposed Floor Plans (rear Building), drawing no. 22018-1002-D - Proposed Elevations (rear building), drawing no. 22018-1004-D - Proposed Plans (External Works - Rear Building), drawing no. 22018-1006-C - Proposed Main House Floor Plans, drawing no. DON01-W2-XX-ZZ-DR-A-010D - Previously approved Rear Building Plans & Elevations (21/01543/FUL), drawing no. 22018-1000-A

    Reference
    U0114320
  • Rear building HMO use

    Policy

    During times where the rear building of the application site is used as a House in Multiple Occupation, the accommodation should be provided in accordance with plan reference (Proposed Plans 2 rev a-05-07-2021-EHO alterations (rear building floor plans and elevations)) approved as part of previous planning approval 21/01543/FUL, in order for residents of HMO bedrooms to have satisfactory access to communal kitchen and living facilities without having to rely on those located in the main building.

    Reference
    U0114321