Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected

Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?

For example, 27 3 2021

Do you want to see entries since the date or after the date?

Clear

8,643 results

  • PLANS

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location Plan, Received: 3/4/2023 Proposed Floor Plans, Received: 3/4/2023

    Reference
    U0114449
  • EXTRACTION DETAILS -30DAYS FROM DECISION

    Policy

    Within 30 days of planning permission being granted, details of an extraction/ventilation system to control the emission of odours and fumes from the nail bar so as to prevent any odour disamenity to nearby residents shall be submitted to the local planning authority in writing, for approval. The approved scheme shall be installed and be fully operational within 30 days of approval. All equipment installed as part of the scheme shall thereafter be operated and maintained in accordance with the manufacturer's instructions. The system shall be so designed as to ensure that noise from its operation does not cause adverse impact to nearby residents.

    Reference
    U0114450
  • WASTE MAN DETAILS-14DAYS FROM DECISION

    Policy

    Within 14 days of planning permission being granted, a scheme for the management and storage of waste at the property shall be submitted to the local planning authority in writing, for approval. The approved scheme shall be fully implemented within 14 days of approval.

    Reference
    U0114451
  • Implementation

    Policy

    The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.

    Reference
    U0114452
  • Approved Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Existing Site and Location Plans (3990-01) - Proposals (3909-02A)

    Reference
    U0114453
  • Temporary Period - 10 Years

    Policy

    The development hereby permitted shall be for a limited period being the period of 10 years from the date of this decision. At the end of this period, the building shall be removed and the land restored in accordance with a scheme previously submitted to and approved in writing by the local planning authority.

    Reference
    U0114454
  • Accordance with plans specified

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location Plan: as received 25/08/2023 Site Plan: Drawing No. 1837/5 as received 30/08/2023 Proposed Plans: Drawing No. 1837/2 as received 30/08/2023

    Reference
    U0114521
  • Approved Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans and specifications. Location Plan. Date received: 04/05/2023. Site Plan. Date received: 18/10/2023. Existing and proposed plans. Date received: 16/10/2023.

    Reference
    U0114530
  • amended

    Policy

    The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: Planning - Proposed Rev b -09.10.2023

    Reference
    U0114533
  • FRA

    Policy

    The development shall be carried out in accordance with the submitted flood risk assessment (ref 15th July 2023 / MAW Town Planning Ltd) and site plan ( and the following mitigation measures it details: o The sales office will be of flood resilient design and construction o The site fencing will be of open design to allow the free movement of flood water across the site These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.

    Reference
    U0114534