Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected

Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?

For example, 27 3 2021

Do you want to see entries since the date or after the date?

Clear

8,643 results

  • Approved plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Sheet Name: Location and Block Plan (Proposed Site Plan). Date: 14/08/2023. Project Number: 1976. Drawing Number: BL 101. Sheet Name: Proposed GF Plan. Date: 14/08/2023. Project Number: 1976. Drawing Number: P101. Sheet Name: Proposed FF Plan. Date: 14/08/2023. Project Number: 1976. Drawing Number: P102. Sheet Name: Proposed Elevations. Date: 14/08/2023. Project Number: 1976. Drawing Number: P103.

    Reference
    U0114601
  • Implementation

    Policy

    The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.

    Reference
    U0114602
  • Approved Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Existing & Proposed (3874-01B)

    Reference
    U0114603
  • Ecology License

    Policy

    No development works shall commence until the applicant has provided to the Local Planning Authority with evidence of either: - A licence issued by Natural England (or another relevant licencing authority) pursuant of Regulation 53 of the Habitats and Species Regulations 2010 authorising the specified activity/development to go ahead; or - A statement in writing from Natural England (or another relevant licencing authority) to the effect that a specific activity /development does not require a licence. This evidence shall be submitted to and approved in writing by the LPA before the commencement of the development.

    Reference
    U0114604
  • FRA Compliance

    Policy

    The development shall be carried out in accordance with the submitted flood risk statement compiled by Building Link Design Architects (13/09/23) and the following mitigation measures it details: - Finished Floor levels of the ground floor will be no lower than 2.88 meters above Ordinance Datum (mAOD); - There shall be no sleeping accommodation located on the ground floor of the development; - Flood resilience measures will be incorporated up to a minimum of 4.4 mAOD; and - Electrical sockets will be raised to a minimum of 4.4 mAOD. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.

    Reference
    U0114605
  • Contamination CON2

    Policy

    Should any unexpected significant contamination be encountered during development, all associated works shall cease and the Local Planning Authority (LPA) be notified in writing immediately. A Phase 3 remediation and Phase 4 verification report shall be submitted the LPA for approval. The associated works shall not re-commence until the reports have been approved by the LPA.

    Reference
    U0114606
  • Contamination CON3

    Policy

    Any soil or soil forming materials brought to site for use in garden areas, soft landscaping, filing and level raising shall be tested for contamination and suitability for use on site. Proposals for contamination testing including testing schedules, sampling frequencies and allowable contaminant concentrations (as determined by appropriate risk assessment) and source material information shall be submitted to and be approved in writing by the Local Planning Authority (LPA) prior to any soil or soil forming materials being brought onto site. The approved contamination testing shall then be carried out and verification evidence submitted to and approved in writing by the LPA prior to any soil and soil forming material being brought on to site.

    Reference
    U0114607
  • Restriction of PD

    Policy

    Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (No.596) (England) Order 2015, Article 3, Schedule 2: Part 1 (or any subsequent order or statutory provision revoking or re-enacting that order) no development shall be carried out on any part of the land other than that hereby permitted without the prior permission of the local planning authority.

    Reference
    U0114608
  • Approved plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Title: Proposed Site Plan. Date: June 23. Project No: 230427. Number: 02. Title: Proposed Plans. Date: June 23. Project No: 230427. Number: 05. Title: Proposed Elevations. Date: June 23. Project No: 230427. Number: 06.1. Title: Proposed Elevations. Date: June 23. Project No: 230427. Number: 06.2.

    Reference
    U0114609
  • Approved Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location/Site Plan - Drawing No PAN420 SGP ST 00 DR A 131012 - Received 11/09/2023 Proposed Plans - Drawing No PAN420 SGP ST 00 DR A 131013 - Received 11/09/2023

    Reference
    U0114614