Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected

Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?

For example, 27 3 2021

Do you want to see entries since the date or after the date?

Clear

8,643 results

  • Photographic Report

    Policy

    Prior to demolition of the current outbuilding a photographic record of all its exterior elevations and any significant internal features shall be submitted to and be to the satisfaction of the Local Planning Authority.

    Reference
    U0116054
  • Render

    Policy

    Render to be used on the rear extension and with regard to any making good of the existing dwelling, and on the rebuilt outbuilding/office shall match that of the existing dwelling unless otherwise agreed in writing by the Local Planning Authority. If the render is not to match a 1m x 1m sample panel, showing colour, finish and texture, shall be prepared on site for the inspection of and approved in writing by the Local Planning Authority. Development to be carried out in accordance with approved details.

    Reference
    U0116055
  • Roof

    Policy

    Prior to relevant works samples of the roof covering/tiles to be used on the porch, rear extension and making good of the existing roof of the main dwelling, and on the rebuilt outbuilding/office shall be provided on site and agreed in writing by the Local Planning Authority. Roof covering of the rebuilt outbuilding/office shall be natural red clay pantiles. Development to be carried out in accordance with approved details.

    Reference
    U0116056
  • Porch

    Policy

    Prior to relevant works full details of the porch shall be submitted to and agreed in writing by the Local Planning Authority. Development to be carried out in accordance with approved details.

    Reference
    U0116057
  • Approved Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans and specifications. Location Plan. Date received: 16/10/2023. Site Plan. Drawing number: 19031-004. Revision 'A'. Date received: 16/10/2023. Proposed Elevations. Drawing number: 19031-012. Revision 'A'. Date received: 22/08/2023. Proposed Floor Plans. Drawing number: 19031-002. Revision 'D'. Date received: 22/08/2023.

    Reference
    U0116088
  • In accordance with specified plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan - Proposed Floor Plans, drawing no. 1331-03 Revision C - Existing and Proposed Elevations, drawing no. 1331-02 Revision A - Proposed Section and Garden Plan, drawing no. 1331-05 - Design and Access Statement (amended version received 16/11/2023)

    Reference
    U0116114
  • Implementation

    Policy

    The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.

    Reference
    U0116125
  • Approved Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Plans and Elevations (03 Rev F)

    Reference
    U0116126
  • External Materials

    Policy

    Prior to the commencement of above ground works, details of the proposed external materials shall be submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved materials.

    Reference
    U0116127
  • Contamination CON2

    Policy

    Should any unexpected significant contamination be encountered during development, all associated works shall cease and the Local Planning Authority (LPA) shall be notified in writing immediately. A Phase 3 remediation and Phase 4 verification report shall subsequently be submitted to the LPA for approval. The associated works shall not re-commence until the reports have been approved by the LPA.

    Reference
    U0116128