Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected

Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?

For example, 27 3 2021

Do you want to see entries since the date or after the date?

Clear

8,643 results

  • Waste Collection

    Policy

    No collection of waste nor deliveries of goods shall take place outside the hours of 07.00 and 21.00hrs on any day.

    Reference
    U0116467
  • Cycle Parking

    Policy

    The development hereby permitted shall not be occupied until details of secure cycle parking facilities for the occupants of, and/or visitors to the development have been submitted to and approved in writing by the local planning authority. These facilities shall be fully implemented and made available for use prior to the occupation of the development hereby permitted and shall thereafter be retained for use at all times.

    Reference
    U0116468
  • Landscape Implementation

    Policy

    Following the commencement of the development and before 30th September of every year during the implementation period (either phased or in full) and 5 year aftercare period, a 'Landscaping Implementation Report' shall be prepared by a suitably qualified landscape architect and / or contractor, and submitted by the developer to the Local Planning Authority in order to demonstrate that the landscaping has been carried out in full accordance with the approved landscaping details. The report should record the landscaping operations carried out on the land since the date of commencement, or previous report / aftercare meeting, and set out the intended operations for the next 12 months. It shall cover the following matters in particular, but not limited to, species, size, location, planting and aftercare specification, and be illustrated with evidence such as an overall progress summary, inspection site visit notes, a schedule of maintenance operations undertaken, before and after photos of any remedial plantings or completed works. If required, the developer shall arrange to attend a site meeting with the Local Planning Authority to inspect the planting and ongoing maintenance requirements.

    Reference
    U0116469
  • BREEAM

    Policy

    Before the development commences, a BREEAM pre-assessment shall be submitted for approval demonstrating how BREEAM 'Very Good' will be met. Unless otherwise agreed, the development must take place in accordance with the approved assessment. Prior to the occupation of any building, a post construction review should be carried out by a licensed assessor and submitted for approval. This will enable the planning condition to be fully discharged. Advice should be sought from a licensed BREEAM assessor at an early stage to ensure that the required performance rating can be achieved. A list of licensed assessors can be found at www.breeam.org.

    Reference
    U0116470
  • sewer y.water

    Policy

    No construction works in the relevant areas of the site shall commence until measures to protect the public water supply infrastructure that is laid within the site boundary have been implemented in full accordance with details that have been submitted to and approved by the Local Planning Authority. The details shall include but not be exclusive to the means of ensuring that access to the pipe for the purposes of repair and maintenance by the statutory undertaker shall be retained at all times.

    Reference
    U0116471
  • CEMP Y.water

    Policy

    Prior to the start of development a Construction Environmental Plan (CEMP) will be required to outline the mitigation techniques that will be implemented to protect the groundwater source, to understand the impact of planning permission on the source protection zone. Furthermore, the findings and recommendations of the study must be implemented.

    Reference
    U0116472
  • SUDS

    Policy

    No building hereby permitted shall be occupied until the sustainable drainage scheme for the site has been completed in accordance with the submitted details. The sustainable drainage scheme shall be designed, managed and maintained in accordance with the Non-statutory technical standards and local standards

    Reference
    U0116473
  • Piped SW discharge

    Policy

    Unless otherwise approved in writing by the Local Planning Authority, there shall be no piped discharge of surface water from the development prior to the completion of the approved surface water drainage works and no buildings shall be occupied or brought into use prior to completion of the approved foul drainage works.

    Reference
    U0116474
  • In accordance with plans specified

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan, drawing no. 23/012/01 - Proposed Floor Plans, drawing no. 23/012/03 - Parking arrangement details, email from Matthew Stables dated 12th May 2023 - Completed Care Home Questionnaire (received 30/05/23) - Planning Statement (amended version received 04/09/2023)

    Reference
    U0116475
  • In accordance with specified plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan, drawing no. 23/012/04 - Proposed Floor Plans, drawing no. 23/012/06 - Completed Care Home Questionnaire (received 30/05/23) - Planning Statement (amended version received 04/09/2023)

    Reference
    U0116476