Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected

Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?

For example, 27 3 2021

Do you want to see entries since the date or after the date?

Clear

8,643 results

  • Approved Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Mooredges Pond 3 Location Plan (27/07/2023) - Mooredges Pond 3 Site Plan (27/07/2023) - Typical Pond Plan and Cross Sections (2021/202/03)

    Reference
    U0116757
  • Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: 3845-10B Proposed Drawings

    Reference
    U0116763
  • temp

    Policy

    The siting of the containers hereby permitted shall be for a limited period being the period of 5 years from the date of this decision. At the end of this period, all containers hereby permitted and any ancillary elements required to site them shall be removed and the land restored in accordance with a scheme previously submitted to and approved in writing by the local planning authority.

    Reference
    U0116764
  • In accordance with specified plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan (amended version received 22/11/2023) - Existing and Proposed Elevations, drawing no. 23075 002 Revision B - Existing and Proposed Sections, drawing no. 23075 102 Revision A - Proposed Ground Floor Plans, drawing no. 23075 100 Revision F - Proposed First Floor Plans, drawing no. 23075 101 Revision B

    Reference
    U0116765
  • Acoustic report

    Policy

    Prior to first occupation, the developer shall provide an acoustic report carried out by a competent acoustician, for approval by the LPA, to demonstrate that the below standards can be achieved in each of the proposed flats: A maximum noise level in the following locations of: - Living rooms - 35 dB LAeq, 16hr (07.00 - 23.00hrs) due to representative external ambient noise; - Bedrooms (daytime resting) - 35 dB LAeq, 16hr (07.00-23.00hrs) due to representative external ambient noise; - Bedrooms - 30 dB LAeq, 8hr (23.00 - 07.00hrs) and individual noise events not normally exceeding 45dB max (F time weighting) due to representative external ambient noise, including during times of typical music noise from nearby licensed premises; - Bedrooms - 47 dB (Leq, 5 minutes), in the 63 Hertz and 41 dB (Leq, 5 minutes) in the125 Hertz octave centre frequency bands, between the hours of 23:00 and 07:00, during times of typical amplified sound from the adjoined licensed premises. If the noise standards are to be met with windows closed, appropriate acoustically attenuated alternative ventilation shall be specified and provided. All such measures as are agreed by the LPA in the approved report, shall be implemented prior to first occupation, and a commissioning report shall be prepared to demonstrate that the measures achieve compliance with the specified acoustic standards.

    Reference
    U0116766
  • Waste Management Plan

    Policy

    Prior to first occupation, the developer shall submit for approval to the LPA, a scheme for the management and storage of waste at the property, including a bin store of suitable construction and sited at an appropriate location. All such requirements of the approved scheme shall be implemented prior to occupation and subsequently complied with. The applicant shall take note of City of Doncaster Council's Technical & Developer Requirements Supplementary Planning Document section 18 for best practice: https://dmbcwebstolive01.blob.core.windows.net/media/Default/Planning/Documents/LDF/SPDs/Technical%20and%20Developer%20Requirements%20SPD%20-%20Adopted%20August%202023.pdf

    Reference
    U0116767
  • Extraction

    Policy

    Should cooking of food become an activity in the Class E unit, the developer shall submit details of an extraction/ventilation system to control the emission of cooking smells and fumes so as to prevent any odour disamenity to nearby residents shall be submitted to and approved by the local planning authority in writing. The approved scheme shall be installed and be fully operational when the use commences. All equipment installed as part of the scheme shall thereafter be operated and maintained in accordance with the manufacturer's instructions. The system shall be so designed as to ensure that noise from its operation does not cause adverse impact to nearby residents.

    Reference
    U0116768
  • In accordance with plans specified

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Existing and Proposed Plans (Includes Location and Site Plans): Drawing No. 023/067/PD

    Reference
    U0116781
  • Materials

    Policy

    The external materials and finishes shall match the existing property unless otherwise indicated on the approved plans.

    Reference
    U0116782
  • In accordance with plans specified

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Existin Plans (includes Location Plan): Drawing No. 01500 - 01 as received 07/07/2023 Site Plan: Drawing No. 03 as received 07/07/2023 Proposed Plans: Drawing No. 01500 - 02 as received 07/07/2023

    Reference
    U0116783