Search for planning and housing data
5,605 results
Dataset:
-
Policy
U0110397Obscure glazing
Before the first occupation of the extension hereby permitted, the first floor side elevation window to the ensuite, as indicated on the approved plans, shall be permanently obscure to a level of obscurity to Pilkington level 3 or above or its technical equivalent by other manufactures and shall be permanently retained in that condition thereafter, unless otherwise approved in writing by the local planning authority.
- Dataset
- Planning condition
- Reference
- U0110397
-
Policy
U0110409Approved Plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans and specifications. Location plan and site plan. Date received: 18/04/2023. Proposed plans (elevations and floor plans). Date received: 18/04/2023.
- Dataset
- Planning condition
- Reference
- U0110409
-
Policy
U0110415Time (amended)
The development to which this permission relates must be begun not later than the expiration of two years from the final approval of the reserved matters or in the case of different dates the final approval of the last such matter to be approved.
- Dataset
- Planning condition
- Reference
- U0110415
-
Policy
U0110416Reserved Matters
Approval of the details of the landscaping (hereinafter referred to as reserved matters) shall be obtained from the Local Planning Authority before the commencement of any works.
- Dataset
- Planning condition
- Reference
- U0110416
-
Policy
U0110417Plans (amended)
The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: 2019/075/OS received 29.10.19 2019/075/02F amended under this permission 13.02.2023 2019/075/04 received 29.10.19
- Dataset
- Planning condition
- Reference
- U0110417
-
Policy
U0110418Opening Hours
The hours of operation shall be limited to Monday - Saturday 07:00 - 18:00 and not at all at any other time.
- Dataset
- Planning condition
- Reference
- U0110418
-
Policy
U0110419No outdoor works
The external area of the premises shall not be used for any works in connection to the industrial units hereby granted nor shall any fixed or mobile equipment audible at the nearest residential boundary be operated in the external area of the premises. REASONS In the interests of amenity of adjacent occupier, in accordance with CS14 of the Core Strategy.
- Dataset
- Planning condition
- Reference
- U0110419
-
Policy
U0110420hard and soft Landscaping to be agreed
No development shall take place on the site until a detailed hard and soft landscape scheme based on the indicative plan (Drawing 2019/075/02A) has been submitted to and approved in writing by the Local Planning Authority. The hard landscape scheme shall include details of all external hard surfacing materials and boundary treatments. The soft landscape scheme shall include a soft landscape plan; a schedule providing plant and tree numbers and details of the species, which shall comply with section 8 Landscape, Trees and Hedgerows of the Council's Development Guidance and Requirements Supplementary Planning Document, nursery stock specification in accordance with British Standard 3936: 1992 Nursery Stock Part One and planting distances of trees and shrubs; a specification of planting and staking/guying; a timescale of implementation; and details of aftercare for a minimum of 5 years following practical completion of the landscape works. Thereafter the landscape scheme shall be implemented in full accordance with the approved details and the Local Planning Authority notified in writing within 7 working days to approve practical completion of any planting within the site. Soft landscaping for any individual plots/units must be implemented in full accordance with the approved scheme, prior to occupation of the unit/plot, which will be monitored by the Local Planning Authority. Any part of the scheme which fails to achieve independence in the landscape, or is damaged or removed within five years of planting shall be replaced during the next available planting season in full accordance with the approved scheme, unless the local planning authority gives its written approval to any variation.
- Dataset
- Planning condition
- Reference
- U0110420
-
Policy
U0110421Y.Water
The site shall be developed with separate systems of drainage for foul and surface water on and off site.
- Dataset
- Planning condition
- Reference
- U0110421
-
Policy
U0110422No access from South Street
The access/egree point existing from South Street shall not be used by vehicles at any time.
- Dataset
- Planning condition
- Reference
- U0110422