U0110423Y Water
There shall be no piped discharge of surface water from the development prior to the completion of surface water drainage works, details of which will have been submitted to and approved by the Local Planning Authority. If discharge to public sewer is proposed, the information shall include, but not be exclusive to: i) evidence that other means of surface water drainage have been properly considered andwhy they have been discounted; and ii) the means of discharging to the public sewer network at a rate not to exceed 3.5 litre per second
- Dataset
- Planning condition
- Reference
- U0110423
-
Policy
U0110424Y Water
In the instance of the 450mm public combined sewer, no building or other obstruction including landscape features shall be located over or within 3.5 metres either side of the centre line of the public sewer i.e. a protected strip width of 7 metres, that crosses the site. Furthermore, no construction works in the relevant area(s) of the site shall commence until measures to protect the public sewerage infrastructure that is laid within the site boundary have been implemented in full accordance with details that have been submitted to and approved by the Local Planning Authority. The details shall include but not be exclusive to the means of ensuring that access to the pipe for the purposes of repair and maintenance by the statutory undertaker shall be retained at all times. If the required stand-off or protection measures are to be achieved via diversion or closure of the sewer, the developer shall submit evidence to the Local Planning Authority that the diversion or closure has been agreed with the relevant statutory undertaker and that, prior to construction in the affected area, the approved works have been undertaken.
- Dataset
- Planning condition
- Reference
- U0110424
-
Policy
U0110425Y Water
In the instance of the 300mm public combined sewer, no building or other obstruction including landscape features shall be located over or within 3 metres either side of the centre line of the public sewer i.e. a protected strip width of 6 metres, that crosses the site. Furthermore, no construction works in the relevant area(s) of the site shall commence until measures to protect the public sewerage infrastructure that is laid within the site boundary have been implemented in full accordance with details that have been submitted to and approved by the Local Planning Authority. The details shall include but not be exclusive to the means of ensuring that access to the pipe for the purposes of repair and maintenance by the statutory undertaker shall be retained at all times. If the required stand-off or protection measures are to be achieved via diversion or closure of the sewer, the developer shall submit evidence to the Local Planning Authority that the diversion or closure has been agreed with the relevant statutory undertaker and that, prior to construction in the affected area, the approved works have been undertaken.
- Dataset
- Planning condition
- Reference
- U0110425
-
Policy
U0110426Yorkshire Water
There shall be no piped discharge of surface water from the development prior to the completion of surface water drainage works, details of which will have been submitted to and approved by the Local Planning Authority. If discharge to public sewer is proposed, the information shall include, but not be exclusive to: i) evidence that other means of surface water drainage have been properly considered andwhy they have been discounted; and ii) the means of discharging to the public sewer network at a rate not to exceed 3.5 litre per second
- Dataset
- Planning condition
- Reference
- U0110426
-
Policy
U0110429Approved plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Titles: Proposed Ground Floor and Elevation Plans. Scale: 1:100. Title: Site Plan (Proposed Site Plan). Scale 1:500.
- Dataset
- Planning condition
- Reference
- U0110429
-
Policy
U0110431Approved plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Title: Location and Block Plans. Date: 19/05/23. DWG No: 23/010-03. Title: Proposed (Proposed Elevations and Floor Plans). Date: 19/05/23. DWG No: 23/010-02. To ensure that the development is carried out in accordance with the application as approved.
- Dataset
- Planning condition
- Reference
- U0110431
-
Policy
U0110470In accordance with specified plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan and Site Plan, drawing no. 002; Received: 17/3/2023 - Existing & Proposed Plans, drawing no. 001C, Received: 9/6/2023
- Dataset
- Planning condition
- Reference
- U0110470
-
Policy
U0110471Windows and rooflights to be installed
The proposed skylights and window in the development hereby approved shall be installed within 3 months of the date of the decision notice.
- Dataset
- Planning condition
- Reference
- U0110471
-
Policy
U0110472Exterior walls to be made good
Within 3 months of the decision notice, the finish of the exterior walls should be made good and finished in materials to match the exterior of the building.
- Dataset
- Planning condition
- Reference
- U0110472
-
Policy
U0110473Granny annex - family only
The annex hereby permitted shall not be occupied at any time other than for purposes ancillary to the residential use of the main dwelling. The annex shall be occupied by family members of residents of the host property only.
- Dataset
- Planning condition
- Reference
- U0110473