Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected
Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?
For example, 27 3 2021
Do you want to see entries since the date or after the date?
Clear

5,605 results

  • Policy

    U0110564

    WSI

    The development shall only take place in accordance with the approved WSI. Prior to commencement of the relevant works as set out in the recommendations of the WSI, the applicant shall contact South Yorkshire Archaeological Service to agree an approved scheme of works. A final report shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the agreed recommendations.

    Reference
    U0110564
  • Policy

    U0110565

    CEMP and EEP

    The approved CEMP shall be adhered to and implemented throughout the construction period strictly in accordance with the approved details, unless otherwise agreed in writing by the local planning authority.

    Reference
    U0110565
  • Policy

    U0110566

    FRA

    The development permitted by this planning permission shall be carried out in accordance with the approved flood risk assessment (FRA) produced by Rangjung Yeshe UK and the following mitigation measures detailed within the FRA: 1. Check and review the registration to Environment Agency Floodline Warnings Direct service. 2. Carry out a regular review of the 'islanding plan'. The mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the timing / phasing arrangements embodied within the scheme, or within any other period as may subsequently be agreed, in writing, by the local planning authority.

    Reference
    U0110566
  • Policy

    U0110567

    EEP

    The approved ecological enhancement plan shall be adhered to and implemented strictly in accordance with the approved details, unless otherwise agreed in writing by the local planning authority. Upon completion of the scheme, a report shall be produced with evidence to demonstrate that the recommendations have been implemented in accordance with the agreed details.

    Reference
    U0110567
  • Policy

    U0110568

    Removed

    Removed.

    Reference
    U0110568
  • Policy

    U0110569

    CMS

    The development hereby permitted must be carried out and completed entirely in accordance with the Construction Method Statement and the details shown on the approved plans and specifications.

    Reference
    U0110569
  • Policy

    U0110570

    Drainage

    No building hereby permitted shall be occupied until surface water drainage works have been implemented in accordance with details that have been submitted to and approved in writing by the Local Planning Authority. Before these details are submitted, an assessment shall be carried out of the potential for disposing of surface water by means of a sustainable drainage system in accordance with the principles set out in NPPF (or any subsequent version), and the results of the assessment provided to the local planning authority. Where a sustainable drainage scheme is to be provided, it shall be designed in accordance with the Non-statutory technical standards for SuDS and local standards.

    Reference
    U0110570
  • Policy

    U0110571

    Materials

    Prior to the commencement of the relevant works, details of the proposed external materials shall be submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved materials.

    Reference
    U0110571
  • Policy

    U0110572

    Workshop temporary uses

    The temporary layout at ground floor level as shown on drawing 'Lindholme Hall Workshop Ground Flood Plan' shall be permitted for a maximum of 2 years from the date of this permission before reverting to the approved layout unless otherwise agreed in writing by the Local Planning Authority.

    Reference
    U0110572
  • Policy

    U0110590

    In accordance with plans specified

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Proposed Plans and Elevations: Drawing No. 100086.05 (Revision G) as received 25/05/2023 Proposed Block Plan: Drawing No. 100086.03 (Rev C) as received 23/05/2023 Location Plan: Drawing No. 100086.01 as received 23/05/2023

    Reference
    U0110590