{"entities":[{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001260,"name":"Drainage details (amended)","dataset":"planning-condition","typology":"policy","reference":"U0113228","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To ensure that the site is connected to suitable drainage systems and to ensure that full details thereof are approved by the Local Planning Authority before any works begin.","description":"The Drainage System as approved under reference 23/00523/COND shall be implemented in accordance with approved drawings listed below: - Drainage Plan, 13664-077-33-A - Surface Water Strategy Report (Marks Heeley Ltd, ref. H16601), April 2023 - Finishes Plan, 13664-077-46 Works shall be carried out concurrently with the development and the drainage system shall be operating to the satisfaction of the Local Planning Authority prior to the occupation of the development."},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001261,"name":"Surface water via interceptor (amended)","dataset":"planning-condition","typology":"policy","reference":"U0113229","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To avoid pollution of the public sewer and land drainage system.","description":"All surface water run off from the site, excepting roof water, shall be discharged to the public surface water sewer/land drainage system or Highway Drain via a suitable oil/petrol/grit interceptor. These arrangements shall be implemented according to details listed below and as approved by the Local Planning Authority under reference 23/00523/COND and they shall be fully operational before the site is brought into use. - Drainage Plan, 13664-077-33-A - Surface Water Strategy Report (Marks Heeley Ltd, ref. H16601), April 2023 - Finishes Plan, 13664-077-46"},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001262,"name":"Vehicle wash run off (amended)","dataset":"planning-condition","typology":"policy","reference":"U0113230","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To avoid pollution of the public sewer and land drainage system.","description":"Any water run off from the vehicle wash down area shall be discharged to the public foul sewer (in accordance with PPG13-Vehicle washing and cleaning) via a suitable oil/ petrol/grit interceptor. These arrangements shall be implemented according to details listed below and as approved by the Local Planning Authority under reference 23/00523/COND and they shall be fully operational before the site is brought into use. - Drainage Plan, 13664-077-33-A - Surface Water Strategy Report (Marks Heeley Ltd, ref. H16601), April 2023 - Finishes Plan, 13664-077-46"},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001263,"name":"CTMP (amended)","dataset":"planning-condition","typology":"policy","reference":"U0113231","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"In the interests of highway safety during the construction of the development.","description":"The Construction Traffic Management Plan as approved under reference 23/00392/COND (Bellamy Roberts, DE/MT/5859/CTMP.1 February 2023). The development shall be carried out in accordance with the agreed details."},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001264,"name":"Facilitation tree works","dataset":"planning-condition","typology":"policy","reference":"U0113232","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To ensure that the work is carried out to the appropriate high standard.","description":"Tree surgery work shall be carried out in full accordance with the scheme hereby approved and in compliance with clause 7: Pruning and related work of British Standard 3998: 2010 Tree Work - Recommendations."},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001265,"name":"Piped discharge","dataset":"planning-condition","typology":"policy","reference":"U0113233","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To ensure that no surface water discharges take place until proper provision has been made for its disposal and in the interest of sustainable drainage.","description":"There shall be no piped discharge of surface water from the development prior to the completion of surface water drainage works , details of which will have been submitted to and approved by the Local Planning Authority. If discharge to public sewer is proposed , the information shall include , but not be exclusive to:- a) evidence to demonstrate that surface water disposal via infiltration or watercourse are not reasonably practical; b) evidence of existing positive drainage to public sewer and the current points of connection; and c) the means of restricting the discharge to public sewer to the existing rate less a minimum 30% reduction, based on the existing peak discharge rate during a 1 in 1 year storm event, to allow for climate change."},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001266,"name":"stat","dataset":"planning-condition","typology":"policy","reference":"U0113251","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"Condition required to be imposed by Section 91(as amended) of the Town and Country Planning Act 1990.","description":"The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission."},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001267,"name":"plans list","dataset":"planning-condition","typology":"policy","reference":"U0113252","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Proposed plans and sections (CCD:04/2201 Rev A) dated APR 23 received 24.7.23 Proposed elevations and roof plan (CCD:04/2202 Rev A) dated APR 23 receievd 24.7.23"},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001268,"name":"materials","dataset":"planning-condition","typology":"policy","reference":"U0113253","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To ensure that the materials are appropriate to the area in accordance with policies 34, 36 and 37 of the Doncaster Local Plan.","description":"Prior to the commencement of the relevant works, details of the proposed external materials shall be submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved materials."},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001269,"name":"Alterations to the existing fire escape","dataset":"planning-condition","typology":"policy","reference":"U0113254","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To protect the special interest of the listed building and preserve the character and appearance of the conservation area it is within in accordance with policies 34, 36 and 37.","description":"Prior to relevant works full details of the alterations to the current fire escape from the basement area shall be submitted to and agreed in writing by the Local Planning Authority. Details shall include how the impact on any historic fabric will be minimised, details of the railings to be installed around the building and the new door. Repairs to render shall match existing in finish/texture and all to be coloured to match the adjoining stonework unless otherwise agreed in writing by the Local Planning Authority. Works to be carried out in accordance with agreed details."}],"links":{"first":"http://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"http://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=8640&limit=10","next":"http://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=1270&limit=10","prev":"http://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=1250&limit=10"},"count":8643}