{"entities":[{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001500,"name":"Opening Hours","dataset":"planning-condition","typology":"policy","reference":"U0114256","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To ensure that the development does not prejudice the local amenity.","description":"The hours of opening shall be limited to: Tuesday to Sunday 11:00 - 22:30 Monday - closed."},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001501,"name":"In accordance with plans specified","dataset":"planning-condition","typology":"policy","reference":"U0114258","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Application forms - Location Plan (amended version received 20/06/2023) - Proposed Site Plan, drawing no. Dwg 103/23/2 (amended version received 19/06/2023) - Proposed elevations and floor plans, drawing no. Dwg 103/23/1B - Design and Access Statement - Preliminary Ecological Appraisal Survey Report, Estrada Ecology, Ref. SQ-1324, 15th September 2023"},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001502,"name":"Landscaping scheme","dataset":"planning-condition","typology":"policy","reference":"U0114259","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To reduce impact of the proposals on the openness of the Green Belt in this location, and to ensure that the development site is landscaped to an acceptable standard, having regard to Policy 48 of the Doncaster Local Plan and Section 13 of the NPPF.","description":"No development shall take place until full details of both hard and soft landscape works with an associated implementation plan, have been submitted to and approved in writing by the Local Planning Authority. The hard landscape details shall include proposed finished levels or contours; means of enclosure; hard surfacing materials and street furniture, where relevant. The soft landscaping works shall include planting plans; written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants and trees, noting species, plant/tree sizes and proposed numbers/densities and the implementation programme. All planting shall be implemented in accordance with the approved details in the first available planting season following the completion of the development, or such longer period which has previously been approved in writing by the Local Planning Authority, and shall be maintained for a period of 5 years from the agreed date of planting. Any trees or plants which die, become diseased, or are removed during the maintenance period shall be replaced with specimens of an equivalent species and size."},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001503,"name":"CEMP","dataset":"planning-condition","typology":"policy","reference":"U0114260","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To ensure the ecological interests of the site are maintained in accordance with Local Plan Policy 29","description":"Prior to commencement of the development hereby approved, a Construction Environmental Management Plan shall be submitted to the LPA for approval, and then implemented in accordance with the approved details. It should include the following: - A risk assessment of the potentially damaging construction activities in relation to the wet ditch that forms the northern boundary of the site - A method statement for the protection of reptiles and other terrestrial fauna that may be encountered on site. ."},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001504,"name":"Ecological Enhancement Plan","dataset":"planning-condition","typology":"policy","reference":"U0114261","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To ensure the ecological interests of the site are maintained in accordance with Local Plan policy 29","description":"Ecological enhancement plan Within 1 month of the commencement of development, an ecological enhancement plan shall be submitted to the local planning authority for approval in writing. This plan shall include details of appropriate measures to enhance the ecological networks associated with the site and be in excess of 0.1 of a biodiversity net gain habitat unit all of which shall be implemented prior to the first occupation of the site. Photographic evidence of implementation must be submitted to the local planning authority"},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001505,"name":"Restriction on use","dataset":"planning-condition","typology":"policy","reference":"U0114262","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To prevent the creation of facilities not associated with the existing greyhound racing stadium use of the site within the Green Belt and thereby leading to unjustified encroachment contrary to Section 13 of the NPPF","description":"The facilities in the development hereby approved shall be used for racing event purposes only."},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001506,"name":"in accordance with specified plans","dataset":"planning-condition","typology":"policy","reference":"U0114263","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Application forms - Heritage Statement - Existing and Proposed Floor Plans, Drawing No. 01, Revision A - Location Plan, Drawing No. 02, Revision B - Existing and Proposed Site Plan - Drawing No. 03, Revision B - Existing and Proposed Elevations, Drawing No. 04, Revision B"},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001507,"name":"Windows doors painted","dataset":"planning-condition","typology":"policy","reference":"U0114264","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To protect the setting of the Listed Building","description":"Within 3 months of the date of corresponding full planning permission under reference 23/01052/FUL granted 22 August 2023, the windows and doors of the outbuilding/residential annexe shall be the same colour as the main listed building."},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001508,"name":"Accordance with Plans Specified","dataset":"planning-condition","typology":"policy","reference":"U0114267","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan, received 21/08/2023 - Proposed Plans, DWG no. 1871/2, received 15/08/2023 - Proposed Block Plan, DWG no. 1871/4, received 15/08/2023 - Proposed Site Plan, DWG no. 1871/5, received 15/08/2023"},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001509,"name":"Approved plans","dataset":"planning-condition","typology":"policy","reference":"U0114286","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Drawing Title: Proposed Plans, Elevations, Proposed Section and Site Plan. Project No: 023. Drawing No: 01. Rev: 01."}],"links":{"first":"http://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"http://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=8640&limit=10","next":"http://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=1510&limit=10","prev":"http://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=1490&limit=10"},"count":8643}