{"entities":[{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001810,"name":"Badger License","dataset":"planning-condition","typology":"policy","reference":"U0115720","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To ensure the ecological interests of the site are maintained in accordance with Local Plan Policy 30 and that no offence is committed in respect of protected species legislation. The Protection of Badgers Act 1992.","description":"No development works shall commence until the applicant has provided to the Local Planning Authority with evidence of either: A licence issued by Natural England pursuant of The Protection of Badgers Act 1992 authorising the specified activity/development to go ahead, or A statement in writing from Natural England (or another relevant licencing authority) to the effect that a specific activity /development does not require a licence."},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001811,"name":"Drainage maintenance","dataset":"planning-condition","typology":"policy","reference":"U0115721","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To ensure the drainage apparatus of the site is adequately maintained for the lifetime of the development and to accord with Para. 169 c) of the NPPF (2021).","description":"Prior to the first occupation of the development hereby approved, details of the drainage management and maintenance plan shall be submitted to and approved in writing by the Local Planning Authority. The drainage system for foul and surface water drainage shall be retained, managed and maintained for the lifetime of the development in accordance with the approved drainage management and maintenance plan."},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001812,"name":"SUDS","dataset":"planning-condition","typology":"policy","reference":"U0115722","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To comply with current planning legislation - National Planning Policy Framework.","description":"No building hereby permitted shall be occupied until the sustainable drainage scheme for the site has been completed in accordance with the details submitted pursuant to condition 28. The sustainable drainage scheme shall be managed and maintained in accordance with the details submitted pursuant to condition 29."},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001813,"name":"No piped discharge surface water","dataset":"planning-condition","typology":"policy","reference":"U0115723","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To ensure that no foul or surface water discharge take place until proper provision has been made for their disposal.","description":"There shall be no piped discharge of surface water from the development prior to the completion of the approved surface water drainage works and no buildings shall be occupied or brought into use prior to completion of the approved foul drainage works."},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001814,"name":"Int Drainage -watercourse","dataset":"planning-condition","typology":"policy","reference":"U0115724","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To ensure adequate access at all times and to protect the culvert from damage.","description":"No building shall be erected within 10 metres of the watercourse or culvert, which passes through/runs adjacent to the site."},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001815,"name":"Net Rail-lighting","dataset":"planning-condition","typology":"policy","reference":"U0115725","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"In the interests of safeguarding the nearby railway line.","description":"Prior to the installation of any lighting adjacent to the railway, details of the location, colour and illumination of any external lighting shall be submitted to and approved in writing by the Local Planning Authority and approved in conjunction with Network Rail. The development shall thereafter be carried out in accordance with the approved details."},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001816,"name":"Net Rail constr methodology","dataset":"planning-condition","typology":"policy","reference":"U0115726","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"In the interests of safety, operational needs and integrity of the railway.","description":"Development shall not commence until a construction methodology has been agreed with the Asset Protection Project Manager at Network Rail and submitted to and approved in writing by the Local Planning Authority which demonstrates that the development can be undertaken without impact to operational railway safety. The development shall thereafter be carried out in accordance with the approved construction methodology."},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001817,"name":"Bridleway Surfacing","dataset":"planning-condition","typology":"policy","reference":"U0115727","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To ensure adequate provision for all types of users of the bridleway in accordance with Doncaster Local Plan Policy 18.","description":"Prior to commencement of works to the existing bridleways within the site, full details of the surfacing materials shall be submitted to and approved in writing by the Local Planning Authority. The surfacing shall be complete prior to the occupation of the last dwelling within the development."},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001818,"name":"In accordance with specified plans","dataset":"planning-condition","typology":"policy","reference":"U0115766","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan - Site Plan - Proposed Ground Floor Layout (amended, received 26/09/2023) - Design and Access Statement"},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001819,"name":"Opening hours","dataset":"planning-condition","typology":"policy","reference":"U0115767","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To ensure that the development does not prejudice the local amenity.","description":"The hours of operation shall be limited to Monday to Friday: 08:00 - 19:00, Saturday and Sunday: Closed"}],"links":{"first":"http://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"http://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=8640&limit=10","next":"http://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=1820&limit=10","prev":"http://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=1800&limit=10"},"count":8643}