{"entities":[{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001940,"name":"In accordance with specified plan","dataset":"planning-condition","typology":"policy","reference":"U0116366","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Site and Location Plans, drawing no. 03-301-Rev G - Proposed Plans and Elevations, drawing no. 03-302-Rev D - Proposed Balcony Screen Details, received 26/10/2023 - Design and Access Statement - Arboricultural Report (Thompson Consultancy), June 2023"},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001941,"name":"Tree Protection Fencing","dataset":"planning-condition","typology":"policy","reference":"U0116367","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To ensure that retained trees are protected from damage during construction.","description":"Tree protection fencing and temporary ground protection where it is required shall be implemented on site in accordance with the recommendations set out within the approved Arboricultural Report (Stage 2 - Version 2 27.06.23 appendices 5 and 7) (dated June 2023) and in compliance with British Standard 5837: 2012 Trees in Relation to Design, Demolition and construction, before any equipment, machinery or materials have been brought on to site for the purposes of the development, and shall be maintained until all equipment, machinery and surplus materials have been removed from the site. Nothing shall be stored or placed in any area fenced in accordance with this condition and the ground levels within those areas shall not be altered, nor shall any excavation be made, without the written consent of the Local Planning Authority."},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001942,"name":"Services, overhead lines and drainage","dataset":"planning-condition","typology":"policy","reference":"U0116368","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To prevent damage being caused to trees which it has been agreed shall be retained and reduce the risk of future conflict with these services and the new planting as a result of future growth.","description":"The alignment of all service trenches and overhead services shall be positioned outside the existing canopy spreads and Root Protection Areas (RPAs) of retained trees, outside areas of proposed replacement tree planting and shall be approved by the Local Planning authority prior to the commencement of development."},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001943,"name":"HIGH8 (amended)","dataset":"planning-condition","typology":"policy","reference":"U0116369","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"In the interests of road safety.","description":"The wheel washing facilities as detailed on the approved site plan (03-301 Revision G) shall be installed before the development hereby approved is commenced and once installed shall be used to prevent mud and other debris being deposited on the highway during the construction of the development."},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001944,"name":"Ecological enhancement plan","dataset":"planning-condition","typology":"policy","reference":"U0116370","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To ensure the ecological interests of the site are maintained in accordance with Local Plan policy 29 and the NPPF","description":"Ecological enhancement plan Prior to the first occupation of the development hereby approved, photographic evidence of the installation of the following measures shall be submitted to the LPA: - 2x Beaumaris Bat boxes (or similar) to be attached to the walls of dwellings to provide additional bat roosting features. - 1x Palight S brick swift box (or similar) to be installed in a north or east facing wall above 5m from ground level."},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001945,"name":"Tree works as agreed plans","dataset":"planning-condition","typology":"policy","reference":"U0116371","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To ensure that the work is carried out to the appropriate high standard and to avoid unnecessary damage/disfigurement to retained trees.","description":"Tree surgery work shall be carried out in accordance with the approved plans and particulars (Stage 2 - Version 2 27.06.23 page 14 ARBORICULTURAL METHOD STATEMENT). Best arboricultural practice shall be employed in all work, which shall comply with British Standards Specification No.3998:2010 Tree works recommendations and unless otherwise agreed with the District Planning Authority shall be completed before the development commences."},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001946,"name":"Tree planting","dataset":"planning-condition","typology":"policy","reference":"U0116372","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To ensure that replacement trees are of a suitable type and standard in the interests of amenity.","description":"Seven (7) replacement trees that comprise of four (4) {Pyrus calleryana 'Chanticleer'} and three (3) {Malus toringo} shall be planted on site during the first available planting season after the commencement of development and prior to the occupation of the new dwelling at the positions shown on Tree Assessment Plan - Proposed Planting ((Stage 2 - Version 2 27.06.23 appendix 6). The replacement trees shall be of 'Heavy Standard' size which have been container grown and must be of a quality which complies with the British Standards Institute specification 3936 for Nursery Stock, 1992 unless specifically agreed in writing with the local planning authority. The planting areas must have characteristics, structure, texture, bulk density and volume that is fit for purpose for the new planting to flourish and follows guidance within British Standards Institute specification BS 8545:2014 Trees: from nursery to independence in the landscape - Recommendations and BS 3882:2015 Specification for topsoil and where appropriate. Any trees dying or becoming severely diseased within five years of planting shall be replaced within the next available planting season.'"},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001947,"name":"Balcony screen","dataset":"planning-condition","typology":"policy","reference":"U0116373","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To protect the privacy and residential amenity of occupiers of the ground floor flats from overlooking into their private garden area, to comply with policies 41 and 44 of the Local Plan.","description":"Prior to first occupation of the first floor flat in the development hereby approved, the balcony shall have screening installed in accordance with details received 26.10.2023 (vertically hung hit and miss slat screening). The screen shall be retained for the lifetime of the development."},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001948,"name":"CDMM Drainage Maintenance","dataset":"planning-condition","typology":"policy","reference":"U0116374","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To ensure the drainage apparatus of the site is adequately maintained for the lifetime of the development and to accord with Para. 169 c) of the NPPF (2023).","description":"Prior to the first occupation of the development hereby approved, details of the drainage management and maintenance plan shall be submitted to and approved in writing by the Local Planning Authority. The drainage system for foul and surface water drainage shall be retained, managed and maintained for the lifetime of the development in accordance with the approved drainage management and maintenance plan."},{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001949,"name":"Approved plans","dataset":"planning-condition","typology":"policy","reference":"U0116378","prefix":"planning-condition","organisation-entity":"109","geometry":"","point":"","quality":"","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Title: Proposed Site Layout. Scale: 1:500. Drawing No: ADP23/P57/02. Title: Proposed Floor Plans. Scale: 1:100. Drawing No: ADP23/P57/05. Title: Proposed Elevations. Scale: 1:100. Drawing No: ADP23/P57/06."}],"links":{"first":"http://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"http://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=8640&limit=10","next":"http://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=1950&limit=10","prev":"http://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=1930&limit=10"},"count":8643}