{"entities":[{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008804,"name":"Cycle facilities","dataset":"planning-condition","typology":"policy","reference":"U0119346","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that satisfactory facilities for the parking of cycles are provided and to encourage travel by means other than private motor vehicles.","description":"The development hereby permitted shall be carried out in accordance with the Proposed Site Plan (DWG no1909-002 Rev B received on 20 August 2018) submitted and approved under planning application reference 18/02086/COND. Thereafter the approved details shall be fully implemented and made available for use prior to the occupation of the development hereby permitted and shall thereafter be retained for use at all times."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008805,"name":"sight lines","dataset":"planning-condition","typology":"policy","reference":"U0119347","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interests of road safety and to provide and maintain adequate visibility.","description":"Before the development is brought into use, the sight lines as shown on the approved plan shall be rendered effective by removing or reducing the height of anything existing on the land hatched black on the said plan which obstructs visibility at any height greater than 900mm above the level of the near side channel line of the public highway. The visibility thus provided shall thereafter be maintained as such, unless otherwise approved in writing with the local planning authority."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008806,"name":"external materials","dataset":"planning-condition","typology":"policy","reference":"U0119348","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the satisfactory appearance of the development.","description":"Prior to their first use on site, samples of the proposed external materials, including, hard and soft landscaping, boundary treatments and bin stores shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved materials."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008807,"name":"contamination","dataset":"planning-condition","typology":"policy","reference":"U0119349","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To secure the satisfactory development of the site in terms of human health and the wider environment pursuant to para. 189 of the National Planning Policy Framework.","description":"No development in the northern part of the site, as illustrated under the Exploratory Hole Location Plan (DWG no42223/001 Rev A) of the Implementation Plan (Issue 1 dated 24 July 2018), approved by this permission shall be commenced (except for demolition) prior to a contaminated land assessment and associated remedial strategy, together with a timetable of works, being accepted and approved by the Local Planning Authority (LPA), unless otherwise approved in writing with the LPA. a) The Phase 2 investigation for the Northern part of the site shall be submitted to the LPA for approval. b) If as a consequence of the Phase 2 Site investigation for the northern part of the site, a Phase 3 remediation report is required this shall be approved by the LPA prior to any remediation commencing on site. The approved Phase 3 remediation works shall be carried out in full on site under a quality assurance scheme to demonstrate compliance with the proposed methodology and best practice guidance. The LPA must be given two weeks written notification of commencement of the remediation scheme works. If during the works, contamination is encountered which has not previously been identified, then all associated works shall cease until the additional contamination is fully assessed and an appropriate remediation scheme approved by the LPA. c) Upon completion of the Phase 3 works, a Phase 4 verification report shall be submitted to and approved by the LPA. The verification report shall include details of the remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology. Details of any post-remedial sampling and analysis to show the site has reached the required clean-up criteria shall be included in the verification report together with the necessary documentation detailing what waste materials have been removed from the site. The site shall not be brought into use until such time as all verification data has been approved by the LPA. Prior to the first occupation on the southern part of the site, as illustrated under the Exploratory Hole Location Plan (DWG no42223/001 Rev A) of the Implementation Plan (Issue 1 dated 24 July 2018), the site shall be subject to remediation as detailed in the Implementation Plan. a) Upon completion of the Phase 3 works, a Phase 4 verification report shall be submitted to and approved by the LPA. The verification report shall include details of the remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology. Details of any post-remedial sampling and analysis to show the site has reached the required clean-up criteria shall be included in the verification report together with the necessary documentation detailing what waste materials have been removed from the site. The site shall not be brought into use until such time as all verification data has been approved by the LPA."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008808,"name":"Soil","dataset":"planning-condition","typology":"policy","reference":"U0119350","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To secure the satisfactory development of the site in terms of human health and the wider environment and pursuant to guidance set out in the National Planning Policy Framework.","description":"Any soil or soil forming materials brought to site for use in garden areas, soft landscaping, filing and level raising shall be tested for contamination and suitability for use on site. Proposals for contamination testing including testing schedules, sampling frequencies and allowable contaminant concentrations (as determined by appropriate risk assessment) and source material information shall be submitted to and be approved in writing by the LPA prior to any soil or soil forming materials being brought onto site. The approved contamination testing shall then be carried out and verification evidence submitted to and approved in writing by the LPA prior to any soil and soil forming material being brought on to site."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008809,"name":"unexpected contamination","dataset":"planning-condition","typology":"policy","reference":"U0119351","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To secure the satisfactory development of the site in terms of human health and the wider environment and pursuant to guidance set out in the National Planning Policy Framework.","description":"Should any unexpected significant contamination be encountered during development, all associated works shall cease and the Local Planning Authority (LPA) be notified in writing immediately. A Phase 3 remediation and Phase 4 verification report shall be submitted to the LPA for approval. The associated works shall not re-commence until the reports have been approved by the LPA."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008810,"name":"Drainage","dataset":"planning-condition","typology":"policy","reference":"U0119352","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interest of satisfactory and sustainable drainage.","description":"The site shall be developed with separate systems of drainage for foul and surface water on and off site."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008811,"name":"Foul and surface water drainage","dataset":"planning-condition","typology":"policy","reference":"U0119353","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development can be properly drained.","description":"No development shall take place until details of the proposed means of disposal of foul and surface water drainage, including details of any balancing works and offsite works, have been submitted to and approved by the local planning authority."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008812,"name":"surface water","dataset":"planning-condition","typology":"policy","reference":"U0119354","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that no foul or surface water discharges take place until proper provision has been made for their disposal.","description":"Unless otherwise approved in writing by the Local Planning Authority, there shall be no piped discharge of surface water from the development prior to the completion of the approved surface water drainage works and no buildings shall be occupied or brought into use prior to completion of the approved foul drainage works."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008813,"name":"PD rights","dataset":"planning-condition","typology":"policy","reference":"U0119355","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"The local planning authority considers that further development could cause detriment to the amenities of the occupiers of nearby properties or to the character of the area and for this reason would wish to control any future development.","description":"Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (Amendment) (No.2) England Order 2008, Article 3, Schedule 2: Part 1 (or any subsequent order or statutory provision revoking or reenacting that order) no development shall be carried out on any part of the land other than that hereby permitted without the prior permission of the local planning authority."}],"links":{"first":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=5600&limit=10","next":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3450&limit=10","prev":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3430&limit=10"},"count":5605,"count_is_capped":false}