{"entities":[{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008814,"name":"Approved plans","dataset":"planning-condition","typology":"policy","reference":"U0119356","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location/Site Plan - Received on 10.07.2020 Proposed Floor Plans - Received on 09.12.2021 Proposed Elevation Plans - Received on 06.10.2021"},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008815,"name":"Hours of operation","dataset":"planning-condition","typology":"policy","reference":"U0119357","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development does not prejudice the local amenity.","description":"The hours of operation shall be limited to Monday to Saturday 11:00 - 23:30 Sunday and Bank Holidays 11:00 - 23:30"},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008816,"name":"Use restriction","dataset":"planning-condition","typology":"policy","reference":"U0119358","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"The local planning authority wishes to retain control over any subsequent change of use of these premises, in the interests of safeguarding the amenities of the area, health, and vitality and viability of the Town Centre.","description":"The premises shall only be used for A3 use (now Class E) and for no other purpose including any A5 use (now sui generis takeaway use) of the Town and Country Planning Use Classes (Amendment) Order 2005 (or any subsequent order or statutory provision revoking or re-enacting that order with or without modification)."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008817,"name":"Matters to be reserved","dataset":"planning-condition","typology":"policy","reference":"U0119444","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To enable the local planning authority to control the development in detail and to comply with Section 92 (as amended) of the Town and Country Planning Act 1990.","description":"Approval of the details of the appearance and landscaping of the site (hereinafter referred to as reserved matters) shall be obtained from the local planning authority before the commencement of any works."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008818,"name":"In accordance with plans","dataset":"planning-condition","typology":"policy","reference":"U0119445","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Drawing number 21.008.1 Rev A dated May 2023 (Location plan) Drawing number 21.008.2 Rev Q dated June 2023 (Site plan) Drawing number 21.008.3 Rev D dated July 2023 (Scale)"},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008819,"name":"Floor levels","dataset":"planning-condition","typology":"policy","reference":"U0119446","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To reduce the risk of flooding to the proposed development and future occupants.","description":"The development shall be carried out in accordance with the submitted flood risk assessment (ref 2880 / Aug 2021 / REV A / J Roberts Design Ltd) and the following mitigation measures it details: i) Finished floor levels shall be set no lower than 6.435 metres above Ordnance Datum (AOD) ii) As per the submitted floor plans, there shall be no ground floor sleeping accommodation within Flood Zone 3 (House Type E Alt) iii) The apartment block (Type C) that proposes ground floor sleeping will be fully located within flood zone 2, as shown in the submitted site plan. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008820,"name":"Noise measures","dataset":"planning-condition","typology":"policy","reference":"U0119447","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that these properties are protected from noise in accordance with the submitted noise report.","description":"There shall be no habitable rooms (including living rooms and bedrooms) facing south or east on plots 1 to 9 and plots 13 and 14 (as per the indicative floorplans). Prior to the occupation of these plots, a high level of acoustic double glazing shall be provided to the windows in the east and south facing elevations together with high specification ventilation systems in accordance with a scheme previously approved in writing by the local planning authority."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008821,"name":"Separate systems of drainage","dataset":"planning-condition","typology":"policy","reference":"U0119448","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interest of satisfactory and sustainable drainage.","description":"The site shall be developed with separate systems of drainage for foul and surface water on and off site. The separate systems should extend to the points of discharge to be agreed."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008822,"name":"No piped discharge of surface water","dataset":"planning-condition","typology":"policy","reference":"U0119449","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that no surface water discharges take place until proper provision has been made for its disposal.","description":"There shall be no piped discharge of surface water from the development prior to the completion of surface water drainage works, details of which will have been submitted to and approved by the Local Planning Authority. If discharge to public sewer is proposed, the information shall include, but not be exclusive to: i) evidence that other means of surface water drainage have been properly considered and why they have been discounted; and ii) the means of discharging to the public sewer network at a rate to be agreed by the Local Planning Authority in consultation with the statutory sewerage undertaker."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008823,"name":"Contamination","dataset":"planning-condition","typology":"policy","reference":"U0119450","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To secure the satisfactory development of the site in terms of human health and the wider environment, in accordance with the National Planning Policy Framework and Doncaster's Local Plan Policy 54 & 55.","description":"No development approved by this permission shall be commenced prior to a contaminated land assessment and associated remedial strategy, together with a timetable of works, being accepted and approved by the Local Planning Authority (LPA), unless otherwise approved in writing with the LPA. a) The Phase 2 site investigation and risk assessment, if appropriate, must be approved by the LPA prior to investigations commencing on site. The Phase 2 investigation shall include relevant soil, soil gas, surface and groundwater sampling and shall be carried out by a suitably qualified and accredited consultant/contractor in accordance with a quality assured sampling and analysis methodology and current best practice. All the investigative works and sampling on site, together with the results of analysis, and risk assessment to any receptors shall be submitted to the LPA for approval. b) If as a consequence of the Phase 2 Site investigation a Phase 3 remediation report is required, then this shall be approved by the LPA prior to any remediation commencing on site. The works shall be of such a nature as to render harmless the identified contamination given the proposed end-use of the site and surrounding environment including any controlled waters, the site must not qualify as contaminated land under Part 2A of the Environment Protection Act 1990 in relation to the intended use of the land after remediation. c) The approved Phase 3 remediation works shall be carried out in full on site under a quality assurance scheme to demonstrate compliance with the proposed methodology and best practice guidance. The LPA must be given two weeks written notification of commencement of the remediation scheme works. If during the works, contamination is encountered which has not previously been identified, then all associated works shall cease until the additional contamination is fully assessed and an appropriate remediation scheme approved by the LPA. d) Upon completion of the Phase 3 works, a Phase 4 verification report shall be submitted to and approved by the LPA. The verification report shall include details of the remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology. Details of any post-remedial sampling and analysis to show the site has reached the required clean-up criteria shall be included in the verification report together with the necessary documentation detailing what waste materials have been removed from the site. The site shall not be brought into use until such time as all verification data has been approved by the LPA."}],"links":{"first":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=5600&limit=10","next":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3460&limit=10","prev":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3440&limit=10"},"count":5605,"count_is_capped":false}