{"entities":[{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008834,"name":"LARGE SCALE MATERIALS - PRECOM","dataset":"planning-condition","typology":"policy","reference":"U0119575","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the satisfactory appearance of the development in accordance with Local Plan Policy 48.","description":"Before the development commences, large scale details, including materials, colours and finishes, at a minimum of 1:20 scale of the items listed below, shall be submitted to and approved in writing by the Local Planning Authority: a) Outer masonry framing which should be set forward of the darker masonry infill panels by around 100-200mm b) Windows and spandrel panels including window reveals of a minimum 150mm, c) Shopfronts and entrance doors and canopies at ground floor level, d) Balconies, e) The proposed standalone bin store, f) Brick detailing including projecting brickwork and soldier coursing to masonry areas, g) The design and furniture for the rooftop amenity area- apart from the pergola no furniture or planting should exceed 1000mm in height. Thereafter, the works shall be carried out in accordance with the approved details."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008835,"name":"NO EXTERNAL PLANT","dataset":"planning-condition","typology":"policy","reference":"U0119576","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interests of the amenities of the locality and occupiers of adjoining property.","description":"No externally mounted plant or equipment for heating, cooling or ventilation purposes, nor grilles, ducts, vents for similar internal equipment, shall be fitted to the building unless full details thereof, including acoustic emissions data, have first been submitted to and agreed in writing with the Local Planning Authority. Once installed such plant or equipment should not be altered."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008836,"name":"BREEAM REVIEW- 6MONTH OCC","dataset":"planning-condition","typology":"policy","reference":"U0119577","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interests of sustainability and to minimise the impact of the development on the effects of climate change.","description":"Within 6months of first occupation, a post construction BREEAM review shall be carried out by a licensed assessor and submitted to the Local Planning Authority for approval."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008837,"name":"REDUCED CO2 PLAN- PRE COM","dataset":"planning-condition","typology":"policy","reference":"U0119578","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interests of sustainability and to minimize the impact of the development on the effects of climate change.","description":"No development shall take place until a statement has been submitted to the local planning authority and approved in writing, explaining how CO2 emissions generated by the development will be reduced. At least 10% of the development's energy consumption must be generated using on-site renewable energy equipment or improvements to the fabric efficiency of the building. Unless otherwise agreed in writing by the local planning authority, the development shall then proceed in accordance with the approved report. To enable full discharge of this condition, prior to the occupation of the building, evidence to demonstrate that the agreed measures have been installed must be provided and agreed by the local planning authority."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008838,"name":"DRAINAGE MAINTENANCE","dataset":"planning-condition","typology":"policy","reference":"U0119579","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the drainage apparatus of the site is adequately maintained for the lifetime of the development and to accord with Para. 169 c) of the NPPF (2023).","description":"Prior to the first occupation of the development hereby approved, details of the drainage management and maintenance plan shall be submitted to and approved in writing by the Local Planning Authority. The drainage system for foul and surface water drainage shall be retained, managed and maintained for the lifetime of the development in accordance with the approved drainage management and maintenance plan."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008839,"name":"CTMP- PRECOM","dataset":"planning-condition","typology":"policy","reference":"U0119580","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To safeguard the living conditions of neighbouring residents and in the interests of highway safety in accordance with Local Plan Policy 13.","description":"No development shall take place, including any works of demolition/site clearance, until a Construction Traffic Method Statement has been submitted to and approved in writing by the local planning authority. The approved statement shall be adhered to throughout the construction period. The statement shall provide for: - the parking of vehicles of site operatives and visitors - loading and unloading of plant and materials - storage of plant and materials used in constructing the development - the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate - wheel washing facilities - measures to control noise and the emission of dust and dirt during construction - a scheme for recycling/disposing of waste resulting from demolition and construction works"},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008840,"name":"YW- STORAGE TANK CAPACITY","dataset":"planning-condition","typology":"policy","reference":"U0119581","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that there are no discharges to the public sewerage system which may injure the sewer, interfere with free flow or prejudicially affect the treatment and disposal of its contents.","description":"Any liquid storage tanks should be located within a bund with a capacity of not less than 110% of the largest tank or largest combined volume of connected tanks."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008841,"name":"YW- FEASIBILITY STUDY","dataset":"planning-condition","typology":"policy","reference":"U0119582","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development can be properly drained.","description":"There shall be no construction of new buildings on site prior to the completion of a feasibility study (CEMP) to understand the impact of planning permission on the source protection zone. Furthermore, the findings and recommendations of the study must be implemented."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008842,"name":"ONSITE BNG - PRECOM","dataset":"planning-condition","typology":"policy","reference":"U0119583","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To fulfil specifically the requirements of Local Plan policy 30B and enhance local ecological networks in accordance with Local Plan policy 29.","description":"Prior to the commencement of development, a Management and Monitoring Plan based on the recommendations in Biodiversity Net Gain Report, Rev. C, Weddle Landscape Design June 2023, Received: 3/7/2023, for proposed onsite habitats shall be submitted to the Local Planning Authority for approval in writing. - The baseline biodiversity assessment against which an uplift in biodiversity unit value of 0.31 Habitat units will be monitored. - The project's biodiversity unit targets. - A detailed adaptive management plan setting out how habitats will be created or enhanced and describing the proposed ongoing management for a minimum of 30 years. - The details of when target condition will be achieved and how it shall be maintained. - A detailed monitoring plan that will be used to inform any potential changes to the ongoing management and assess the progress towards achieving target condition. This should outline the surveys that will be used to inform condition monitoring reports. Monitoring reports will be provided to the Local Planning Authority by the end of years 1,2,5,10,20, and 30 of the monitoring period. - The roles, responsibilities and professional competencies of the people involved in implementing and monitoring the biodiversity net gain delivery. - Evidence that the necessary resources are available to deliver the proposed biodiversity net gain plan and the ongoing management. Once approved the Management and Monitoring Plan shall be implemented in full and any subsequent changes to management as a result of findings from the monitoring agreed in writing with the Local Planning Authority."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008843,"name":"TRAVEL PLAN- 3MONTH OCC","dataset":"planning-condition","typology":"policy","reference":"U0119584","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interests of promoting sustainable travel in accordance with Local Plan Policy 13.","description":"Within 3 months of the first occupation of any commercial unit or first occupation of each office floor, a Detailed Travel Plan for that unit shall be submitted to the local planning authority. The Travel Plan shall include staff numbers; targets for reducing single occupancy car trips, and details of the monitoring to be carried out."}],"links":{"first":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=5600&limit=10","next":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3480&limit=10","prev":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3460&limit=10"},"count":5605,"count_is_capped":false}