{"entities":[{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008924,"name":"Contaminated land","dataset":"planning-condition","typology":"policy","reference":"U0120068","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To secure the satisfactory development of the site in terms of human health and the wider environment, in accordance with the National Planning Policy Framework and Policies 54 and 55 of the Local Plan.","description":"Any soil or soil forming materials brought to site for use in garden areas, soft landscaping, filing and level raising shall be tested for contamination and suitability for use on site. Proposals for contamination testing including testing schedules, sampling frequencies and allowable contaminant concentrations (as determined by appropriate risk assessment) and source material information shall be submitted to and be approved in writing by the Local Planning Authority (LPA) prior to any soil or soil forming materials being brought onto site. The approved contamination testing shall then be carried out and verification evidence submitted to and approved in writing by the LPA prior to any soil and soil forming material being brought on to site."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008925,"name":"PD rights removed","dataset":"planning-condition","typology":"policy","reference":"U0120069","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"The local planning authority considers that further development could be contrary to Policy 25 of the Local Plan, and for this reason would wish to control any future development.","description":"Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (No.596) (England) Order 2015, Article 3, Schedule 2: Part 1 (or any subsequent order or statutory provision revoking or re-enacting that order) no development shall be carried out on any part of the land other than that hereby permitted without the prior permission of the local planning authority."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008926,"name":"Ecology","dataset":"planning-condition","typology":"policy","reference":"U0120070","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the ecological interests of the site are maintained in accordance with Local Plan policy 29","description":"Within one month of commencement of development activities a plan shall be submitted to the local planning authority for approval in writing. This plan shall provide details of the measures and their implementation as proposed in section 6.3 of the report Middleton Bell MBE/BAT/2022/07/02 all of which shall be implemented prior to the first occupation of the site or an alternative timescale to be approved in writing with the local planning authority: Photographic evidence of the implemented measures must be submitted to the local planning authority:"},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008927,"name":"Highways access","dataset":"planning-condition","typology":"policy","reference":"U0120071","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure a safe and suitable access is provided for the existing dwelling in accordance with paragraph 110 of the NPPF","description":"Notwithstanding submitted plans, prior to the development being brought into use or any new access is constructed (whichever is the sooner), a scheme to show the formation, laying out and construction of the new access point for the existing dwelling onto New Mill Field Road shall be submitted to and approved in writing by the Local Planning Authority. The submitted scheme shall include dimensions, surfacing and a scaled drawing to show how the access will tie into the adopted highway including a drop kerb. The formation, laying out and construction of this new access point shall be completed in accordance with the approved scheme and before the development hereby granted is brought into use."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008928,"name":"Tree Protection","dataset":"planning-condition","typology":"policy","reference":"U0120072","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that all trees are protected from damage during construction in accordance with Local Plan Policy 32.","description":"Prior to the commencement of the development hereby granted a scheme for the protection of the root protection areas of all trees shown for retention on the approved plan that complies with clause 6.2 of British Standard 5837: 2012 Trees in Relation to Design, Demolition and Construction - Recommendations shall be submitted to and approved in writing by the Local Planning Authority. Tree protection shall be implemented on site in accordance with the approved details and the local planning authority notified of implementation to approve the setting out of the tree protection scheme before any equipment, machinery or materials have been brought on to site for the purposes of the development. Thereafter, all tree protection shall be maintained in full accordance with the approved details until all equipment, machinery and surplus materials have been removed from the site, unless the local planning authority gives its written approval to any variation. Nothing shall be stored or placed in any area fenced in accordance with this condition and the ground levels within those areas shall not be altered, nor shall any excavation be made, without the written consent of the Local Planning Authority."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008929,"name":"Unexpected contamination","dataset":"planning-condition","typology":"policy","reference":"U0120073","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To secure the satisfactory development of the site in terms of human health and the wider environment, in accordance with the National Planning Policy Framework and Policies 54 and 55 of the Local Plan.","description":"Should any unexpected significant contamination be encountered during development, all associated works shall cease and the Local Planning Authority (LPA) be notified in writing immediately. A Phase 3 remediation and Phase 4 verification report shall be submitted the LPA for approval. The associated works shall not re-commence until the reports have been approved by the LPA."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008930,"name":"Plans","dataset":"planning-condition","typology":"policy","reference":"U0120076","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location Plan received 24.01.24 Dwg. No. J12747.001 Layout of temporary modular office unit on site received 24.01.24 Dwg. No. J6542/001/006 Revision D Preliminary Drainage and Services Plan showing proposed routes and connections received 24.01.24"},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008931,"name":"SUDS","dataset":"planning-condition","typology":"policy","reference":"U0120077","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that surface water is discharged to soakaway where possible in accordance with Policy 56 of the Local Plan.","description":"The surface water sustainable system (SuDS) as shown on the approved plans shall be designed and installed on the approved development. The system shall be designed such that no additional or increased rate of flow of surface water will drain to any water body or adjacent land and that there is capacity in the installed drainage system to contain below ground level the run-off from a 1 in 100 year rainfall event plus 40% on stored volumes as an allowance for climate change as set out in National Planning Practice Guidance. In the event that a SuDS compliant design is not reasonably practical, then the developer shall seek written approval from the local planning authority for an alternative system prior to bringing the building into use."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008932,"name":"FRA","dataset":"planning-condition","typology":"policy","reference":"U0120078","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To reduce the risk of flooding to the proposed development and future occupants","description":"The development shall be carried out in accordance with the submitted flood risk assessment from Don Valley Engineering Limited and the following mitigation measures it details: o Finished floor levels of the modular cabins shall be set no lower than 6.325 metres above Ordnance Datum (AOD) as stated within the FRA. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008933,"name":"Plans","dataset":"planning-condition","typology":"policy","reference":"U0120085","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Site plan. Dwg. No. 2023-08-003. Revision A. Date 18/01/24. Received: 19/02/2024 Elevations and floor plans. Dwg. No. 2023-08-002. Revision C. 26/11/23. Received: 19/02/2024"}],"links":{"first":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=5600&limit=10","next":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3570&limit=10","prev":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3550&limit=10"},"count":5605,"count_is_capped":false}