{"entities":[{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009014,"name":"Occupancy restriction","dataset":"planning-condition","typology":"policy","reference":"U0120757","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the flat does not become a separate unit and thereby harming the amenity of the dwelling and conflicting with the commercial operations of the Welfare Club.","description":"The flat hereby permitted shall not be occupied at any time other than by staff of the Askern Miners Welfare Club and Institute and members of their household."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009015,"name":"Implementation","dataset":"planning-condition","typology":"policy","reference":"U0120789","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"Condition required to be imposed by Section 91(as amended) of the Town and Country Planning Act 1990.","description":"The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009016,"name":"Approved Plans","dataset":"planning-condition","typology":"policy","reference":"U0120790","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan (274842-6187-NMA-040-ZZ-DR-A-0001) (Rev P02) - Proposed Elevations (274842-6187-NMA-040-ZZ-DR-A-2001) (Rev P02) - Proposed Site Plan (274842-6187-NMA-040-ZZ-DR-A-0003) (Rev P02) - Proposed Ground Floor Plan (274842-6187-NMA-040-00-DR-A-1001) (Rev P02) - Proposed Roof Plan (274842-6187-NMA-040-R0-DR-A-1001) (Rev P02) - Flood Evacuation Plan (V01) (received 15 February 2023)"},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009017,"name":"FRA Compliance","dataset":"planning-condition","typology":"policy","reference":"U0120791","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To reduce the risk of flooding to the proposed development and future occupants.","description":"The development shall be carried out in accordance with the submitted flood risk assessment, details in the Design and Access Statement (ref 274842-6187-BWL-040-XX-RP-A-0001_Design and Access Statement_S4_P02_D0100) and the following mitigation measures it detailed therein: - Finished floor levels shall be set no lower than 4.1 metres above Ordnance Datum (AOD) These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009018,"name":"Landscaping","dataset":"planning-condition","typology":"policy","reference":"U0120792","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interests of environmental quality and in accordance with Policy 48 of the Local Plan.","description":"The following approved landscaping scheme shall be implemented in full accordance with the following details: - Landscape Design (revision 06) (274842-6187-ECS-040-00-DR-L-0001-S4-06-D1200) - Landscape Outline Specification & Maintenance Schedule (revision 04) (274842-6187-ECS-040-00-SP-L-0002-S4-04-D1200) Any part of the scheme which fails to achieve independence in the landscape, or is damaged or removed within five years of planting shall be replaced during the next available planting season in full accordance with the approved scheme."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009019,"name":"Contamination Assessment","dataset":"planning-condition","typology":"policy","reference":"U0120793","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To secure the satisfactory development of the site in terms of human health and the wider environment, in accordance with the National Planning Policy Framework and Policies 54 and 55 of the Local Plan.","description":"The approved Phase 3 remediation works as identified within the submitted report 'HMP Hatfield Multifaith building, Phase3 (Rev 2), Remediation Statement P21- 01357. Met Engineers. 31/1/24' shall be carried out in full on site under a quality assurance scheme to demonstrate compliance with the proposed methodology and best practice guidance. The LPA shall be given two weeks written notification of the commencement of the remediation scheme works. If during the works, contamination is encountered which has not previously been identified, then all associated works shall cease until the additional contamination is fully assessed and an appropriate remediation scheme approved by the LPA. Upon completion of the Phase 3 works, a Phase 4 verification report shall be submitted to and approved by the LPA. The verification report shall include details of the remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology. Details of any post-remedial sampling and analysis to show the site has reached the required clean-up criteria shall be included in the verification report together with the necessary documentation detailing what waste materials have been removed from the site. The site shall not be brought into use until such time as all verification data has been approved by the LPA."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009020,"name":"Contamination (CON2B)","dataset":"planning-condition","typology":"policy","reference":"U0120794","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To secure the satisfactory development of the site in terms of human health and the wider environment, in accordance with the National Planning Policy Framework and Policies 54 and 55 of the Local Plan.","description":"Should any unexpected significant contamination be encountered during development, all associated works shall cease and the Local Planning Authority (LPA) be notified in writing immediately. A Phase 3 remediation and Phase 4 verification report shall be submitted to the LPA for approval. The associated works shall not re-commence until the reports have been approved by the LPA."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009021,"name":"Contamination (CON3B)","dataset":"planning-condition","typology":"policy","reference":"U0120795","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To secure the satisfactory development of the site in terms of human health and the wider environment, in accordance with the National Planning Policy Framework and Policies 54 and 55 of the Local Plan.","description":"Any soil or soil forming materials brought to site for use in garden areas, soft landscaping, filing and level raising shall be tested for contamination and suitability for use on site. Proposals for contamination testing including testing schedules, sampling frequencies and allowable contaminant concentrations (as determined by appropriate risk assessment) and source material information shall be submitted to and be approved in writing by the LPA prior to any soil or soil forming materials being brought onto site. The approved contamination testing shall then be carried out and verification evidence submitted to and approved in writing by the LPA prior to any soil and soil forming material being brought on to site."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009022,"name":"Lighting","dataset":"planning-condition","typology":"policy","reference":"U0120796","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the proposed lighting scheme safeguards the character of the area and/or the living conditions of neighbouring residents, having regard to the effects of the proposed illumination.","description":"Prior to the installation of any external lighting, details shall be submitted to and approved in writing by the local planning authority. The external lighting shall be installed in accordance with the approved details and thereby retained as such unless a variation is subsequently submitted to and approved in writing by the local planning authority."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009023,"name":"Drainage","dataset":"planning-condition","typology":"policy","reference":"U0120797","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the site is connected to suitable drainage systems and to ensure that full details thereof are approved by the Local Planning Authority before any works begin.","description":"The development hereby granted shall be carried out in accordance with the following information: - Drainage Details Sheet 1 of 2 (6187 Rev P1) - Drainage Details Sheet 2 of 2 (6187 Rev P1) - Proposed Drainage Layout (6187 Rev P5) - Drainage Calculations (25/01/2024) The drainage system shall be operating prior to the first use of the development."}],"links":{"first":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=5600&limit=10","next":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3660&limit=10","prev":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3640&limit=10"},"count":5605,"count_is_capped":false}