{"entities":[{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009044,"name":"Rainwater goods","dataset":"planning-condition","typology":"policy","reference":"U0120920","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To protect the special interest of the listed building and preserve the character and appearance of the conservation area.","description":"Prior to commencement of relevant works the specification of any replacement rainwater goods shall be submitted to and approved in writing by the Local Planning Authority. A sample of the material shall be provided on site for inspection. Rainwater goods to painted green to match existing unless otherwise agreed in writing by the Local Planning Authority. Works shall be carried out in accordance with approved details."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009045,"name":"Replacement Windows","dataset":"planning-condition","typology":"policy","reference":"U0120921","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To protect the special interest of the listed building and preserve the character and appearance of the conservation area.","description":"The design of the replacement windows shall match exactly those existing unless otherwise agreed in writing by the Local Planning Authority and be in timber. Prior to commencement their colour and finish shall be submitted to and agreed in writing by the Local Planning Authority. Works shall be undertaken in accordance with approved details."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009046,"name":"In accordance with plans specified","dataset":"planning-condition","typology":"policy","reference":"U0120980","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan, drawing no. 2021/120/01A - Proposed Head Office Elevations and Renders, drawing no. 2021/120/02A - Proposed Head Office Ground Floor Plan and Site Plan, drawing no. 2021/120/03B - Proposed Head Office First Floor Plan and Second Floor Plan, drawing no. 2021/120/04A - Proposed Weigh-Bridge General Arrangement Plan, drawing no. 2021/120/05A - Flood Risk Assessment, J Roberts Design Ltd, ref. 3697/November 2022 - Drainage Plan, drawing no. 3770-851-P4 - Arboricultural Report and Impact Assessment, AWA Tree Consultants, ref. AWA5089, dated November 2022 - Arboricultural Method Statement, AWA Tree Consultants, ref. AWA5089AMS, dated December 2022"},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009047,"name":"Construction Traffic Management Plan","dataset":"planning-condition","typology":"policy","reference":"U0120981","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To safeguard the living conditions of neighbouring residents and in the interests of highway safety","description":"No construction works shall take place until full details of offsite highway works have been submitted to and agreed in writing by the Local Planning authority within a Construction Traffic Management Plan. The development shall be carried out in accordance with the agreed details and cover the following points, expanded on as required: - Volumes and types of construction vehicles - identification of delivery routes; - identification of agreed access point - Contractors method for controlling construction traffic and adherence to routes - Size, route and numbers of abnormal loads - Swept path analysis (as required) - Construction Period - Temporary signage - Wheel Wash facilities - Timing of deliveries"},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009048,"name":"Ecological Enhancement Plan","dataset":"planning-condition","typology":"policy","reference":"U0120982","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the ecological interests of the site are maintained in accordance with Local Plan policy 29","description":"Prior to the commencement of development, an ecological enhancement plan shall be submitted to the local planning authority for approval in writing. This plan shall include details of the following measure, which shall be implemented prior to the first occupation of the site or an alternative timescale to be approved in writing with the local planning authority: -Four swift boxes of the Vivara Pro Woodstone type or similar, to be located on the aspect of the building above 5m on walls away from trees as instructed by a suitably qualified ecologist."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009049,"name":"Hard/soft landscaping scheme","dataset":"planning-condition","typology":"policy","reference":"U0120983","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"Prior approval of such details is necessary as the site may contain features which require incorporation into the approved development, and to ensure that the development site is landscaped to an acceptable standard having regard to Policies 46 and 48 of the Doncaster Local Plan (2021).","description":"No development shall take place until full details of both hard and soft landscape works with an associated implementation plan, have been submitted to and approved in writing by the Local Planning Authority. The hard landscape details shall include proposed finished levels or contours; means of enclosure; hard surfacing materials and street furniture, where relevant. The soft landscaping works shall include planting plans; written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants and trees, noting species, plant/tree sizes and proposed numbers/densities and the implementation programme. All planting shall be implemented in accordance with the approved details in the first available planting season following the completion of the development, or such longer period which has previously been approved in writing by the Local Planning Authority, and shall be maintained for a period of 5 years from the agreed date of planting. Any trees or plants which die, become diseased, or are removed during the maintenance period shall be replaced with specimens of an equivalent species and size."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009050,"name":"Drainage major maintenance","dataset":"planning-condition","typology":"policy","reference":"U0120984","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the drainage apparatus of the site is adequately maintained for the lifetime of the development and to accord with Para. 1 of the NPPF (2023).","description":"Prior to the first occupation of the development hereby approved, details of the drainage management and maintenance plan shall be submitted to and approved in writing by the Local Planning Authority. The drainage system for foul and surface water drainage shall be retained, managed and maintained for the lifetime of the development in accordance with the approved drainage management and maintenance plan."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009051,"name":"EV charging spaces","dataset":"planning-condition","typology":"policy","reference":"U0120985","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interests of combatting the effects of climate change and to comply with the Equalities Act 2010, in accordance with DLP policies 13 and 46.","description":"Prior to first occupation of the development hereby approved, the EV charging points shall be fully implemented as per the approved Site Plan and made available for use. Where provided for use with accessible parking spaces, these shall meet the standards required by EV Charging/Disability PAS1899 guidance. Once installed, they shall be retained for the lifetime of the development."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009052,"name":"Tree protection","dataset":"planning-condition","typology":"policy","reference":"U0120986","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"to ensure that all trees are protected from damage during construction and adopted Doncaster Local Plan 2015 - 2035 Policy 32: Woodlands, Trees and Hedgerows section B.","description":"The erection of temporary protection fencing for the protection of any retained tree shall be undertaken in accordance with the approved plans and particulars with arboricultural method statement (Ref: AWA5089AMS) and Tree Protection Plan (Appendix 4: Tree protection plan of AMS AWA5089AMS) before any equipment, machinery or materials have been brought on to site for the purposes of the development, and shall be maintained until all equipment, machinery and surplus materials have been removed from the site. Nothing shall be stored or placed in any area fenced in accordance with this condition and the ground levels within those areas shall not be altered, nor shall any excavation be made, without the written consent of the local planning authority."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009053,"name":"FFLs and flood mitigation measures","dataset":"planning-condition","typology":"policy","reference":"U0120987","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To reduce the risk of flooding to the proposed development and future occupants, and to comply with Doncaster Local Plan Policy 57 and NPPF paragraph 173","description":"The development hereby approved shall be carried out in accordance with the submitted flood risk assessment (ref. J Roberts Design Ltd, ref. 3697/November 2022). Minimum finished floor levels (FFL) shall be 7.76mAOD with removable flood barriers to a height of 8.23mAOD (7.76mAOD + 600mm) across doorways and entrances. The mitigation measures contained at Section 7 (page 21) of the FRA shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."}],"links":{"first":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=5600&limit=10","next":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3690&limit=10","prev":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3670&limit=10"},"count":5605,"count_is_capped":false}