{"entities":[{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009164,"name":"Amended Plans","dataset":"planning-condition","typology":"policy","reference":"U0121604","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: Site plan / site plan indicating parking arrangements Received: 28/03/2024 / 15/04/2024 Proposed elevations and floorplans. Plan Revision 'C'. Received: 28/03/2024"},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009165,"name":"In accordance with plans specified","dataset":"planning-condition","typology":"policy","reference":"U0121611","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location Plan: as received 22/03/2024 Site Plan: as received 22/03/2024 Existing and Proposed Plans: as received 22/03/2024"},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009166,"name":"In accordance with plans specified","dataset":"planning-condition","typology":"policy","reference":"U0121642","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location Plan: as received 11/03/2024 Site Plan: as received 11/03/2024 Existing and Proposed Plans: as received 11/03/2024"},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009167,"name":"Approved plans","dataset":"planning-condition","typology":"policy","reference":"U0121643","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Dwg. No. PC538/01 Rev A Location / Site Plan Revision C received 24.04.24 Dwg. No. PC538/04 Rev A Proposed 4 Bed Floor Plan received 23.04.24"},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009168,"name":"Drainage","dataset":"planning-condition","typology":"policy","reference":"U0121644","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that surface water is discharged to soakaway where possible in accordance with Policy 56 of the Local Plan.","description":"A surface water sustainable system (SuDS) shall be designed and installed on the approved development. The system shall be designed such that no additional or increased rate of flow of surface water will drain to any water body or adjacent land and that there is capacity in the installed drainage system to contain below ground level the run-off from a 1 in 100 year rainfall event plus 40% on stored volumes as an allowance for climate change as set out in National Planning Practice Guidance. In the event that a SuDS compliant design is not reasonably practical, then the developer shall seek written approval from the local planning authority for an alternative system prior to bringing the building into use."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009169,"name":"Ecology Enhancement Plan","dataset":"planning-condition","typology":"policy","reference":"U0121645","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To mitigate and enhance biodiversity on site as required by Policies 26 and 29 of the Local Plan.","description":"Within one month of commencement, a lighting design strategy for light-sensitive biodiversity in the peripheral areas residential development and shall be submitted to and approved in writing by the Local Planning Authority. The strategy shall show how, external lighting is specified, located and orientated so that it can be clearly demonstrated that it will not disturb or adversely affect the use of the semi-natural areas of the site and bat boxes installed under EPS licence. Any luminaries used in the peripheral areas of the site adjoining areas of greenspace should be of the LED type which provide a lower intensity of light. The use of warm white spectrum (preferably 2700Kelvin) should be adopted to reduce the blue light component with a wavelength exceeding 550nm. The strategy shall be informed by the Institute of Lighting Professionals/Bat Conservation Trust, Guidance Note 08/23: Bats and Artificial Lighting in the UK. All external lighting shall be installed in accordance with the specification and locations set out in the strategy and maintained as such."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009170,"name":"Landscaping","dataset":"planning-condition","typology":"policy","reference":"U0121646","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure a suitable landscaped layout is agreed as required by Policy 48 of the Local Plan.","description":"Prior to the occupation of the dwellings hereby permitted, a scheme for the landscaping of the site shall be submitted to and approved in writing by the local planning authority. The landscaping scheme shall include details of hard landscaping, planting plans, written specifications (including cultivation and other operations associated with tree, shrub, hedge or grass establishment), schedules of plants noting species, plant sizes, the proposed numbers and densities and an implementation programme. All hard and soft landscaping comprised in the approved details of landscaping shall be carried out in the first planting and seeding seasons following the occupation of the buildings or the completion of the development, whichever is the sooner; and any trees or plants which within a period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009171,"name":"Windows and doors","dataset":"planning-condition","typology":"policy","reference":"U0121647","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To protect the character of the building and setting of a listed building.","description":"Prior to the installation of any new or replacement fenestration as part of the development hereby permitted, drawings indicating details of all new and replacement windows and external doors, including reveals, materials and finishes, shall be submitted to and approved in writing by the local planning authority. The development shall thereafter be carried out in complete accordance with the approved details and retained thereafter."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009172,"name":"Cycle","dataset":"planning-condition","typology":"policy","reference":"U0121648","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that satisfactory facilities for the parking of cycles are provided and to encourage travel by means other than private motor vehicles and to comply with policy 13 of the Doncaster Local Plan.","description":"The development hereby permitted shall not be commenced until details of secure cycle parking facilities for the occupants of, and/or visitors to the development have been submitted to and approved in writing by the local planning authority. These facilities shall be fully implemented and made available for use prior to the occupation of the development hereby permitted and shall thereafter be retained for use at all times."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009173,"name":"Access","dataset":"planning-condition","typology":"policy","reference":"U0121649","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure adequate footpath and vehicular access provision for the development in accordance with Policy 13 of the Local Plan.","description":"Before the development is brought into use, that part of the site to be used by vehicles and pedestrians shall be surfaced, drained and where necessary marked out in a manner to be approved in writing by the local planning authority."}],"links":{"first":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=5600&limit=10","next":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3810&limit=10","prev":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3790&limit=10"},"count":5605,"count_is_capped":false}