{"entities":[{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009204,"name":"CMS - precom","dataset":"planning-condition","typology":"policy","reference":"U0121857","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"This condition is to ensure that local amenity is protected as required by Policies 13 and 46 of the Local Plan. The condition is required to be satisfied prior to the commencement of development to ensure satisfactory controls are in place from the outset.","description":"No development shall take place, including any works of demolition, until a Construction Method Statement has been submitted to and approved in writing by the local planning authority. The approved statement shall be adhered to throughout the construction period. The statement shall provide for: i) - the parking of vehicles of site operatives and visitors ii) - loading and unloading of plant and materials iii) - storage of plant and materials used in constructing the development iv) - the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate v) - wheel washing facilities vi) - measures to control noise and the emission of dust and dirt during construction vii) - a scheme for recycling/disposing of waste resulting from demolition and construction works"},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009205,"name":"Drainage - Precom","dataset":"planning-condition","typology":"policy","reference":"U0121858","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the site is connected to suitable drainage systems as required by Policy 56 of the Local Plan. The details are required at this stage to ensure that full details thereof are approved by the Local Planning Authority before any works begin.","description":"The development hereby permitted shall not be begun until details of the foul, surface water and land drainage systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the relevant part of the drainage system that serves those plots shall be operating to the satisfaction of the Local Planning Authority prior to the occupation of the of those plots. If discharge to public sewer is proposed, the information shall include: a) evidence to demonstrate that surface water disposal via infiltration or watercourse are not reasonably practical; c) the means of restricting the discharge to public sewer to the a rate not to exceed 2 litres per second. These works shall be carried out concurrently with the development and the drainage system shall be operating to the satisfaction of the Local Planning Authority prior to the occupation of the development."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009206,"name":"Soft Landscaping - precom","dataset":"planning-condition","typology":"policy","reference":"U0121859","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that landscaping is factored into the development in accordance with Policies 32 and 48 of the Local Plan. The condition is required to be discharge prior to the commencement of development to ensure that the layout is agreed before further works take place.","description":"No development shall take place on the site until a detailed hard and soft landscape scheme based on the approved landscape masterplan (Dwg. No. (P)50 Rev G) has been submitted to and approved in writing by the Local Planning Authority. The scheme shall make provision for at least 58 trees across the site. The soft landscape scheme shall include a soft landscape plan; a schedule providing plant and tree numbers and details of the species, which shall comply with the Council's Supplementary Planning Guidance, nursery stock specification in accordance with British Standard 3936: 1992 Nursery Stock Part One and planting distances of trees and shrubs; a specification of planting and staking/guying; a timescales for delivery; a specification for planting including details of tree support, tree pit surfacing, aeration and irrigation and details of management and maintenance for a minimum of 5 years following practical completion of the landscape works. For areas of public space remaining, the scheme shall include details of who would be responsible for its upkeep and maintenance for the lifetime of the development. Thereafter the landscape scheme shall be implemented within the first year following commencement of the development in accordance with the approved details and the Local Planning Authority shall be notified in writing within 7 working days to approve practical completion of any planting within public areas or adoptable highway within the site. Soft landscaping for any individual housing plot must be implemented in accordance with the approved scheme, prior to occupation of the home. Any part of the scheme which dies, or is damaged or removed within five years of planting shall be replaced during the next available planting season with others of similar size and species."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009207,"name":"Tree protection - precom","dataset":"planning-condition","typology":"policy","reference":"U0121860","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that all trees are protected from damage during construction in accordance with Policy 32 of the Local Plan.","description":"Prior to the commencement of the development hereby granted a scheme for the protection of all retained trees that complies with clause 6.2 of British Standard 5837: 2012 Trees in Relation to Design, Demolition and Construction - Recommendations shall be submitted to and approved in writing by the Local Planning Authority. Tree protection shall be implemented on site in accordance with the approved details and the Local Planning Authority notified of implementation to approve the setting out of the tree protection scheme before any equipment, machinery or materials have been brought on to site for the purposes of the development. Thereafter, all tree protection shall be maintained in full accordance with the approved details until all equipment, machinery and surplus materials have been removed from the site, unless the local planning authority gives its written approval to any variation. Nothing shall be stored or placed in any area fenced in accordance with this condition and the ground levels within those areas shall not be altered, nor shall any excavation be made, without the written consent of the Local Planning Authority."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009208,"name":"BNG Plan - Ecology - precom","dataset":"planning-condition","typology":"policy","reference":"U0121861","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the habitat creation on site and subsequent management measures are sufficient to deliver a net gain in biodiversity in accordance with Policy 30 of the Local Plan. These details are required prior to the commencement of development to ensure minimum requirements are achieved.","description":"Prior to the commencement of development, a Bio-diversity Plan for proposed onsite habitats shall be submitted to the Local Planning Authority for approval in writing. The Plan shall detail the following: An adaptive management plan for the site detailing the management measures to be carried out over the phased restoration of the site in order to achieve the target conditions. Objectives relating to the timescales in which it is expected progress towards meeting target habitat conditions will be achieved. A commitment to adaptive management that allows a review of the management plan to be undertaken and changes implemented if agreed in writing by the LPA and if monitoring shows that progress towards target conditions is not progressing as set out in the agreed objectives. That monitoring reports shall be provided to the LPA on the 1st November of each year of monitoring (Years 1, 2, 3, 5, and 10)) immediately following habitat creation. Once approved in writing the management measures and monitoring plans shall be carried out as agreed."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009209,"name":"CON1C - precom","dataset":"planning-condition","typology":"policy","reference":"U0121862","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To secure the satisfactory development of the site in terms of human health and the wider environment, in accordance with Policies 54 and 55 of the Local Plan. Details are required prior to commencement of development to ensure appropriate safeguards are in place and can be verified after completion.","description":"No development approved by this permission shall be commenced prior to a contaminated land assessment and associated remedial strategy, together with a timetable of works, being accepted and approved by the Local Planning Authority (LPA), unless otherwise approved in writing with the LPA. a) The Phase I desktop study, site walkover and initial assessment must be submitted to the LPA for approval. Potential risks to human health, property (existing or proposed) including buildings, livestock, pets, crops, woodland, service lines and pipes, adjoining ground, groundwater, surface water, ecological systems, archaeological sites and ancient monuments must be considered. The Phase 1 shall include a full site history, details of a site walkover and initial risk assessment. The Phase 1 shall propose further Phase 2 site investigation and risk assessment works, if appropriate, based on the relevant information discovered during the initial Phase 1 assessment. b) The Phase 2 site investigation and risk assessment, if appropriate, must be approved by the LPA prior to investigations commencing on site. The Phase 2 investigation shall include relevant soil, soil gas, surface and groundwater sampling and shall be carried out by a suitably qualified and accredited consultant/contractor in accordance with a quality assured sampling and analysis methodology and current best practice. All the investigative works and sampling on site, together with the results of analysis, and risk assessment to any receptors shall be submitted to the LPA for approval. c) If as a consequence of the Phase 2 Site investigation a Phase 3 remediation report is required, then this shall be approved by the LPA prior to any remediation commencing on site. The works shall be of such a nature as to render harmless the identified contamination given the proposed end-use of the site and surrounding environment including any controlled waters, the site must not qualify as contaminated land under Part 2A of the Environment Protection Act 1990 in relation to the intended use of the land after remediation. d) The approved Phase 3 remediation works shall be carried out in full on site under a quality assurance scheme to demonstrate compliance with the proposed methodology and best practice guidance. The LPA must be given two weeks written notification of commencement of the remediation scheme works. If during the works, contamination is encountered which has not previously been identified, then all associated works shall cease until the additional contamination is fully assessed and an appropriate remediation scheme approved by the LPA. e) Upon completion of the Phase 3 works, a Phase 4 verification report shall be submitted to and approved by the LPA. The verification report shall include details of the remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology. Details of any post-remedial sampling and analysis to show the site has reached the required clean-up criteria shall be included in the verification report together with the necessary documentation detailing what waste materials have been removed from the site. The site shall not be brought into use until such time as all verification data has been approved by the LPA."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009210,"name":"Materials - precom","dataset":"planning-condition","typology":"policy","reference":"U0121863","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the appearance of the development is good quality in accordance with Policies 42 and 44 of the Local Plan.","description":"Prior to the commencement of development, full details of the external materials to be used for the dwellings shall be submitted to and approved in writing by the Local Planning Authority. The details shall include roof parapet construction, window detailing, window and column design. The details shall include a section showing parapet height and roof fall for the roof construction in accordance with the agreed details. Development shall be carried out in accordance with the approved details."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009211,"name":"Bin storage","dataset":"planning-condition","typology":"policy","reference":"U0121864","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interests of providing sufficient refuse storage near the public highway as required by Policies 13, 42 and 44 of the Local Plan. The condition is required to be discharged prior to the commencement of development to ensure that it can be provided prior to the occupation of any dwelling on the site.","description":"Prior to commencement of development, details of bin storage shall be submitted to and approved in writing by the local planning authority. The details shall include the details of the storage area and the position within the plot. The bin storage shall be implemented in accordance with the approved pdetails and made available for use prior to the occupation of that respective dwelling. The bin store shall thereafter be retained for use at all times."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009212,"name":"Boundary treatments","dataset":"planning-condition","typology":"policy","reference":"U0121865","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interests of providing robust boundary treatments as required by Policies 42 and 44 of the Local Plan. The condition is required to be discharged prior to the commencement of development to ensure that it can be provided prior to the occupation of any dwelling on the site.","description":"Prior to the first occupation of any dwelling, details of all proposed boundary treatments shall be submitted to and approved in writing by the Local Planning Authority. Boundary treatments between Units 11 and 12 facing Glebe Road and between units 1 and 22 facing Elmhurst Road must consist of a 1.8m high brick wall. Development shall be carried out in accordance with the agreed details prior to the occupation of that respective dwelling."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009213,"name":"Units 11 and 12 GF Plans","dataset":"planning-condition","typology":"policy","reference":"U0121866","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the build out is achievable prior to the commencement of development as required by Policies 42 and 44 of the Local Plan.","description":"Prior to the commencement of development, a floor plan layout shall be submitted showing the finalised layouts to Units 11 and 12., denoting lift access to the first floor."}],"links":{"first":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=5600&limit=10","next":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3850&limit=10","prev":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3830&limit=10"},"count":5605,"count_is_capped":false}