{"entities":[{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009274,"name":"In accordance with plans specified","dataset":"planning-condition","typology":"policy","reference":"U0122244","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location Plan: as received 04/03/2024 Site Plan: as received 30/04/2024 Existing and Proposed Plans: Drawing No. MS/54/24-01A as received 04/03/2024"},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009275,"name":"Amended plans","dataset":"planning-condition","typology":"policy","reference":"U0122247","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: Site plan. Job no. SH:23. Drg no. PL:03. Date received: 06/03/2024 Proposed elevations and floor plans. Job no. SH:23. Drg no. PL: 02. Date received: 11/04/2024"},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009276,"name":"FA 01 Flooding","dataset":"planning-condition","typology":"policy","reference":"U0122248","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that any new development complies with Environment Agency standing advice","description":"Floor levels within the proposed development will be built at the existing floor levels."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009277,"name":"Plans","dataset":"planning-condition","typology":"policy","reference":"U0122249","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Site plan. Date received: 26/03/2024 Proposed elevations 01 Revision C and 02 Revision A. Date received: 26/03/2024 Proposed floorplans. Option 1D Rev C. Date received: 18/03/2024 Proposed photovoltaic details/plans. Date received: 26/03/2024"},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009278,"name":"Plans","dataset":"planning-condition","typology":"policy","reference":"U0122252","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans and specifications. Site Plan. Date received: 02/04/2024. Principle Shelter Plan. Drawing number: 223990-101. Issue: A. Date received: 02/04/2024. Signage Product Specification Sheet. Date received: 02/04/2024. Proposed Sign Plans. Drawing number: ICON86_OD_HB_DS_BSU. Date received: 02/04/2024."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009279,"name":"In accordance with plans specified","dataset":"planning-condition","typology":"policy","reference":"U0122276","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location Plan: as received 02/04/2024 Site Plan: as received 02/04/2024 Proposed Plans (Digital Panel Drawing): Drawing No. CON86_OD_HB_DS_BSU as received 02/04/2024 Proposed Plans (Principal Shelter Drawing): Drawing No. 223990-101 as received 02/04/2024"},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009280,"name":"Illumination Level","dataset":"planning-condition","typology":"policy","reference":"U0122277","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interests of highway safety and local visual amenity in accordance with policy 49 of the Doncaster Local Plan.","description":"The luminance of the advertisement hereby approved shall not exceed a maximum of 284 cd/m2."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009281,"name":"Approved Plans","dataset":"planning-condition","typology":"policy","reference":"U0122280","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans and specifications. Existing and Proposed Plans incl. Site and Location Plan. Date received: 26/03/2024."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009282,"name":"In accordance with plans specified","dataset":"planning-condition","typology":"policy","reference":"U0122281","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location Plan - Drawing No. A1324/5 as received 05/04/2024 Proposed Site Plan - Drawing No. A1324/4 as received 05/04/2024 Existing and Proposed Plans (Elevations) - Drawing No. A1324/3 as received 05/04/2024 Proposed Floor Plans - Drawing No. A1324/2 as received 05/04/2024"},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009283,"name":"In accordance with plans specified","dataset":"planning-condition","typology":"policy","reference":"U0122284","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location and Site Plan: Drawing No. BDS-2023-50-04-DFG as received 03/04/2024 Proposed Plans: Drawing No. BDS-2023-50-02-DFG as received 03/04/2024 Proposed Elevations: Drawing No. BDS-2023-50-03-DFG as received 03/04/2024"}],"links":{"first":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=5600&limit=10","next":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3920&limit=10","prev":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3900&limit=10"},"count":5605,"count_is_capped":false}