{"entities":[{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009344,"name":"Opening hours","dataset":"planning-condition","typology":"policy","reference":"U0122451","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development does not prejudice the local amenity.","description":"The hours of operation shall be limited to Monday - Friday 0600-1800 hrs, Saturday 0700-1800 hrs, Sunday 0800-1600 hrs, and not at all at other times."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009345,"name":"Implementation","dataset":"planning-condition","typology":"policy","reference":"U0122477","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"Condition required to be imposed by Section 91(as amended) of the Town and Country Planning Act 1990.","description":"The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009346,"name":"Approved Plans","dataset":"planning-condition","typology":"policy","reference":"U0122478","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan (002-24-00) - Proposed Site & Location Plan (002-24-01A) - Proposed Plan & Elevations (002-24-02B)"},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009347,"name":"Contamination CON1","dataset":"planning-condition","typology":"policy","reference":"U0122479","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To secure the satisfactory development of the site in terms of human health and the wider environment, in accordance with the National Planning Policy Framework and Policies 54 and 55 of the Local Plan.","description":"Prior to the commencement of development, a contaminated land assessment and associated remedial strategy, together with a timetable of works, shall be submitted to and approved in writing by the Local Planning Authority (LPA). a) The Phase I desktop study, site walkover and initial assessment must be submitted to the LPA for approval. Potential risks to human health, property (existing or proposed) including buildings, livestock, pets, crops, woodland, service lines and pipes, adjoining ground, groundwater, surface water, ecological systems, archaeological sites and ancient monuments must be considered. The Phase 1 shall include a full site history, details of a site walkover and initial risk assessment. The Phase 1 shall propose further Phase 2 site investigation and risk assessment works, if appropriate, based on the relevant information discovered during the initial Phase 1 assessment. b) The Phase 2 site investigation and risk assessment, if appropriate, must be approved by the LPA prior to investigations commencing on site. The Phase 2 investigation shall include relevant soil, soil gas, surface and groundwater sampling and shall be carried out by a suitably qualified and accredited consultant/contractor in accordance with a quality assured sampling and analysis methodology and current best practice. All the investigative works and sampling on site, together with the results of analysis, and risk assessment to any receptors shall be submitted to the LPA for approval. c) If as a consequence of the Phase 2 Site investigation a Phase 3 remediation report is required, then this shall be approved by the LPA prior to any remediation commencing on site. The works shall be of such a nature as to render harmless the identified contamination given the proposed end-use of the site and surrounding environment including any controlled waters, the site must not qualify as contaminated land under Part 2A of the Environment Protection Act 1990 in relation to the intended use of the land after remediation. d) The approved Phase 3 remediation works shall be carried out in full on site under a quality assurance scheme to demonstrate compliance with the proposed methodology and best practice guidance. The LPA must be given two weeks written notification of commencement of the remediation scheme works. If during the works, contamination is encountered which has not previously been identified, then all associated works shall cease until the additional contamination is fully assessed and an appropriate remediation scheme approved by the LPA. e) Upon completion of the Phase 3 works, a Phase 4 verification report shall be submitted to and approved by the LPA. The verification report shall include details of the remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology. Details of any post-remedial sampling and analysis to show the site has reached the required clean-up criteria shall be included in the verification report together with the necessary documentation detailing what waste materials have been removed from the site. The site shall not be brought into use until such time as all verification data has been approved by the LPA."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009348,"name":"CEMP","dataset":"planning-condition","typology":"policy","reference":"U0122480","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the ecological interests of the site are maintained in accordance with Policy 29 of the Local Plan.","description":"Prior to the commencement of development, a Construction Environmental Management Plan (CEMP) based on the measures outlined in Section 6 of the Preliminary Ecological Appraisal JCA Ref: 21309/E1 26/01/24 shall be submitted to and approved in writing by the Local Planning Authority. The approved CEMP shall thereafter be implemented in accordance with the approved details. The measures must include: - A risk assessment of the potentially damaging construction activities in relation to wildlife and habitats. - A method statement for the protection of reptiles and other terrestrial fauna that may be encountered on site. - Measures to protect the adjacent Local Wildlife Site, Long Plantation - The use of protective fencing, exclusion barriers and wildlife safety measures."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009349,"name":"Ecological Enhancement Plan","dataset":"planning-condition","typology":"policy","reference":"U0122481","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the ecological interests of the site are maintained in accordance with Policy 29 of the Local Plan.","description":"Prior to the commencement of above ground works, an ecological enhancement plan shall be submitted to the Local Planning Authority for approval in writing. This plan shall include details of the measures outlined in Section 6 of the Preliminary Ecological Appraisal JCA Ref: 21309/E1 26/01/24, all of which shall be implemented prior to the first occupation of the site."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009350,"name":"FRA Compliance","dataset":"planning-condition","typology":"policy","reference":"U0122482","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To reduce the risk of flooding to the proposed development and future occupants and to prevent flooding elsewhere by ensuring that compensatory storage of flood water is provided.","description":"The development shall be carried out in accordance with the submitted flood risk assessment (ref 23486-FRA-001 / Rev B / Received 30/04/2024 / D) and the following mitigation measures it details: - Finished floor levels shall be set no lower than 5 metres above Ordnance Datum (AOD); - Compensatory storage shall be provided and maintained as detailed within Section 3 and Appendix D of the submitted FRA; and - Flood resistance and resilience measures shall be incorporated into the development as detailed within the submitted FRA. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009351,"name":"Amended/approved plans","dataset":"planning-condition","typology":"policy","reference":"U0122485","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the amended/approved plans listed below: Amended plan: Proposed Site Plan. Scale: 1:500. Received by City of Doncaster Council on the 13/05/2024. Amended plans: Title: Proposed Detached Garage/Workshop. DWG No BEN24/04 B. Received by City of Doncaster Council on the 13/05/2024. Approved plans: Title: Plans/Elevations As Proposed. DWG No BEN24/02A. Amendment A March 24 Door Flood Barrier Note F/Floor Side WC Window Added."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009352,"name":"Garage Condition.","dataset":"planning-condition","typology":"policy","reference":"U0122486","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To protect the enjoyment of the residential amenity of the neighbouring properties and their residents.","description":"The detached garage/workshop hereby permitted shall be used for private vehicles only and remain as a garage/workshop incidental to the use of the host dwelling and be used for no other purposes."},{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009353,"name":"Yorkshire Water - Waste Water","dataset":"planning-condition","typology":"policy","reference":"U0122487","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interest of satisfactory and sustainable drainage.","description":"The site shall be developed with separate systems of drainage for foul and surface water on and off site. The separate systems should extend to the points of discharge to be agreed."}],"links":{"first":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=5600&limit=10","next":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3990&limit=10","prev":"https://www.staging.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3970&limit=10"},"count":5605,"count_is_capped":false}