{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":10000000729,"name":"","dataset":"planning-application","typology":"geography","reference":"23/01643/FUL","prefix":"planning-application","organisation-entity":109,"geometry":"","point":"","quality":"","description":"Enlargement of the existing car park, reconfiguration of the building entrance and internal alterations including the introduction of a mid-height floor to the existing sports hall to provide a bowling alley at ground floor with a gym at first floor level, refurbishment to the swimming pool and erection of an associated substation. (AMENDED)","decision-date":"2024-02-09"}