{"entry-date":"2025-11-12","start-date":"2017-09-01","end-date":"","entity":1704317,"name":"R127","dataset":"brownfield-land","typology":"geography","reference":"R127","prefix":"brownfield-land","organisation-entity":72,"geometry":"","point":"POINT (-1.91844 52.758157)","quality":"authoritative","notes":"Whole site (cross boundary with Lichfield DC) proposed for residential led mixed use redevelopment following closure of the power station. Planning application CH/19/201, outline approval April 2021/Site also included within ELAA Site Ref RE24. CONSTRUCTION EXPECTED TO TAKE PLACE BETWEEN 2021-2040. CH/21/0308 is reserved matters following outline approval (access, appearance, landscaping and layout prusuant to 19/00753/OUTMEI and CH/19/201) for the construcion of a Riverside Park, approved December 2021. Basis of 50dpa for y1 and 100dpa after. Phasing assumes 350units to Cannock Chase in first 5years with addiitonal 650units in pt2 assumed 6-15years.The site has been allocated for strategic mixed use land within the Local Plan Review Reg 19.","hectares":"35.5","deliverable":"yes","site-address":"Rugeley Power Station, Rugeley","site-plan-url":"https://experience.arcgis.com/experience/8e50063287754d05a04fcee7a1fe68e7","ownership-status":"not-owned-by-a-public-authority","maximum-net-dwellings":"1000","minimum-net-dwellings":"1000","planning-permission-date":"2021-04-07","planning-permission-type":"outline-planning-permission","planning-permission-status":"permissioned"}