{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73000415,"name":"Approved plans","dataset":"planning-condition","typology":"policy","reference":"U0109212","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Drawing No. TM-01-P16 Rev 02 - Site Location Plan Drawing No. TM-01-P17 - 33kV Tertiary Connection Cable Arrangement Between the NG Substation and the Solar Substation"}