{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73000424,"name":"Amended plans","dataset":"planning-condition","typology":"policy","reference":"U0109272","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: Proposed Plans - 1:200 site plan; Revision D; Drawing no. 22-01-H-110-008; Amended 27/04/2023; Received 07/05/2023 Site plan; Revision C; Drawing no. 22-01-H-110-009; Amended 27/04/2023; Received 07/05/2023 Proposed floor plans; Revision B; Drawing no. 22-01-H-110-010; Amended 05/04/2023; Received 05/04/2023 Proposed elevations; Revision B; Drawing no. 22-01-H-110-011; Amended 05/04/2023; Received 05/04/2023 Location plan; Revision D; Drawing no. 22-01-H-110-001; Received 15/01/2023"}