{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73000471,"name":"Ecology","dataset":"planning-condition","typology":"policy","reference":"U0109586","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the ecological interests of the site are maintained in accordance with the NPPF and Local Plan policy 29 and 30.","description":"Prior to the first occupation all ecological enhancement measures as set out in section 6.4 of the document Ecological Impact Assessment Middleton Bell ref: MBE/ECO/2023/03/01 8th Mach 2023 must be implemented. Photographic evidence of the implemented measures must be submitted to the local planning authority:"}