{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73000478,"name":"Approved plans","dataset":"planning-condition","typology":"policy","reference":"U0109601","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: Proposed plans and elevations; Project: 2205; Drawing no. 01; Revision B; Received 23/03/2023 Site plan; Drawing no. 22-05-101; Rev: 01, Received 23/03/2023 Location plan; Received 23/03/2023"}