{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73000492,"name":"Approved Plans","dataset":"planning-condition","typology":"policy","reference":"U0109704","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: Location plan. Drawing number: 22580_P_001. Date received: 06/04/2023. Existing and proposed site block plan. Drawing number: 22580_P_002. Date received: 06/04/2023. Proposed plans. Drawing number: 22580_P_004_01. Date received: 06/04/2023. Proposed elevations. Drawing number: 22580_P_004_02. Date received: 16/05/2023."}