{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73000564,"name":"In accordance with specified plans","dataset":"planning-condition","typology":"policy","reference":"U0110021","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan, drawing no. 00-01 - Existing and Proposed Plans, drawing no. 23-001, Revision 1.1 - Proposed Site Plan - Vehicle Parking, drawing no. 10-02, Revision 1.0 - Design and Access Statement - Flood Risk Assessment"}