{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73000593,"name":"Approved Plans","dataset":"planning-condition","typology":"policy","reference":"U0110247","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan (100022432) - Proposed Site Plan - Schematic Elevations / Site Layout (22001-002 Rev A) - Schematic Floor Plans (22001-001 Rev A) - Drainage Strategy (23138-DR-C-0100 Rev P3) (received 25 May 2023) - Ecological Enhancement Plan (May 2023)"}