{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73000757,"name":"Accordance with Plans Specified","dataset":"planning-condition","typology":"policy","reference":"U0110802","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Proposed Floor Plans: Drawing No. 23/008/04C as received 08/05/2023 Proposed Elevations: Drawing No. 23/008/06C as received 08/05/2023 Site Plan (Proposed): Drawing No. 23/008/05C as received 08/05/2023 Site Plan: Drawing No. 23/008/09 as received 08/05/2023 Location Plan: Drawing No. 23/008/08 as received 08/05/2023"}