{"entry-date":"2025-03-20","start-date":"","end-date":"","entity":73001036,"name":"Ecological Enhancement Plan","dataset":"planning-condition","typology":"policy","reference":"U0112208","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the ecological interests of the site are maintained in accordance with Policy 29 of the Local Plan.","description":"Prior to the first occupation of the site, an ecological enhancement plan shall be implemented including the following measures: - One integrated bat box of the Vivaro Pro, build-in. Bat Tube (or similar) or an 'Improved Crevice Bat Box' (or similar) be installed within each of the proposed dwellings on plots 1 and 2. The bat boxes shall thereafter be retained."}