{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008830,"name":"CLASS E(b) EXTRACTION PRE-OCC","dataset":"planning-condition","typology":"policy","reference":"U0119571","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interests of the amenity of the occupiers.","description":"Prior to the occupation of any Class E(b) uses (sale of food and drink) details of extraction/ventilation systems, to control the emission of cooking smells and fumes so as to prevent any odour disamenity to nearby occupiers, shall be submitted to and approved by the local planning authority in writing. The approved scheme shall be installed and be fully operational when the use commences. All equipment installed as part of the scheme shall thereafter be operated and maintained in accordance with the manufacturer's instructions. The system shall be so designed as to ensure that noise from its operation does not cause adverse impact to nearby occupiers."}