{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008866,"name":"Drainage Compliance","dataset":"planning-condition","typology":"policy","reference":"U0119715","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the site is connected to suitable drainage systems.","description":"The development hereby granted shall be carried out in accordance with the approved drainage documentation listed below: - Drainage Calculations (4106/800 Rev P1) (received 05 February 2024) - Surface Water Drainage Design (4106 / Feb 2024 / REV A) (received 05 February 2024) The drainage system shall be operating prior to the occupation of the development."}