{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008932,"name":"FRA","dataset":"planning-condition","typology":"policy","reference":"U0120078","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To reduce the risk of flooding to the proposed development and future occupants","description":"The development shall be carried out in accordance with the submitted flood risk assessment from Don Valley Engineering Limited and the following mitigation measures it details: o Finished floor levels of the modular cabins shall be set no lower than 6.325 metres above Ordnance Datum (AOD) as stated within the FRA. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."}