{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73008980,"name":"EEP","dataset":"planning-condition","typology":"policy","reference":"U0120355","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the ecological interests of the site are maintained in accordance with Local Plan Policy 29 and the NPPF","description":"Within one month of commencement of the development, an ecological enhancement plan shall be submitted to the local planning authority for approval in writing. This plan shall include details of type, location and orientation of the following measures, all of which shall be implemented prior to the first occupation of the site or an alternative timescale to be approved in writing with the local planning authority: - The installation of integrated 2 bat boxes into built structures - The installation of 2 swift boxes into built structures."}