{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009040,"name":"FRA Compliance","dataset":"planning-condition","typology":"policy","reference":"U0120860","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure water sensitive infrastructure remains operational during flood events.","description":"The development shall be carried out in accordance with the submitted flood risk assessment compiled by RAB Consultants, referenced 3074, Version 1.0 dated 21/12/2022, and the following mitigation measures it details: - All water sensitive infrastructure shall be set above the Isle of Axholme critical flood level plus 300mm of freeboard (4.4 metres above Ordnance Datum) These mitigation measures shall be fully implemented and maintained thereafter throughout the lifetime of the development."}