{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009047,"name":"Construction Traffic Management Plan","dataset":"planning-condition","typology":"policy","reference":"U0120981","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To safeguard the living conditions of neighbouring residents and in the interests of highway safety","description":"No construction works shall take place until full details of offsite highway works have been submitted to and agreed in writing by the Local Planning authority within a Construction Traffic Management Plan. The development shall be carried out in accordance with the agreed details and cover the following points, expanded on as required: - Volumes and types of construction vehicles - identification of delivery routes; - identification of agreed access point - Contractors method for controlling construction traffic and adherence to routes - Size, route and numbers of abnormal loads - Swept path analysis (as required) - Construction Period - Temporary signage - Wheel Wash facilities - Timing of deliveries"}