{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009085,"name":"Turbine Cables","dataset":"planning-condition","typology":"policy","reference":"U0121263","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To minimise the visual impact of the development.","description":"All cables from the turbines to the sub-station shall be underground. The connection from the control building to the national grid shall be underground as far as is reasonably practicable and in locations such as road or stream crossings where underground connections are not practicable they shall be on wooden poles."}