{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009124,"name":"FRA","dataset":"planning-condition","typology":"policy","reference":"U0121404","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"1. To prevent flooding impacting on the works. 2. To prevent an increase in flood risk elsewhere. 3. To prevent an increase in surface water runoff from the site. 4. To protect the banks of the River Torne. 5. To prevent an increase in flood risk elsewhere.","description":"The development permitted by this planning permission shall be carried out in accordance with the approved flood risk assessment (FRA) and the following mitigation measures detailed within the FRA: 1. Machinery and plant to be stored to the north of the site in flood zone 1. 2. There should be no raising of ground levels, either permanently or temporarily in flood zones 2 or 3. 3. There should be no inclusion of impermeable surfacing of the site. 4. There should be no excavation within 8 metres from the top of bank of the River Torne, a designated 'main river'. 5. Finished ground levels to be no greater than existing ground levels. The mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the timing/phasing arrangements embodied within the scheme, or within any other period as may subsequently be agreed, in writing, by the Local Planning Authority."}