{"entry-date":"2025-06-24","start-date":"","end-date":"","entity":73009127,"name":"Dilapidation","dataset":"planning-condition","typology":"policy","reference":"U0121407","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interest of amenity and highway safety.","description":"A dilapidation survey is to be carried out along Great Black Lane before development commences and a further survey carried once development ceases, with results submitted to the Local Planning Authority. Any repair works required to the Lane shall be undertaken within 1 month of completion of the restoration of the site."}